1111 S FIGUEROA ST 90015
Certificate Information: 1111 S FIGUEROA ST 90015
- Application / Permit
- 23016-20000-42678
- Plan Check / Job No.
- B23VN16587
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (4) Sports Arena (unlimited seating capacity)
- Work Description
- ePlan INTERIOR TENANT IMPROVEMENT / ALTERATION OF EXISTING ARENA BUILDING. THE PROJECT SCOPE INCLUDES A NEW INTERIOR CITY VIEW TERRACE CLUB (CVT) WHICH INCLUDES THE REMOVAL OF UPPER SEATING BOWL SEATS(REMOVAL OF 327 SEATS FROM SECTIONS #325, 326, 327,328) FOR THE NEW CLUB (2,830SF) WITH 128 TICKETED SEATS(FIXED SEATS AND DRINK RAILS). THE NEW PROJECT CREATES A NET REDUCTION OF 199 OCCUPANTS ON THE UPPER SEATING BOWL. THE EXTERIOR RENOVATION INCLUDES THE REPAIR OF TOPPING SLAB ON EXISTING EXTERIOR TERRACE (9,600SF) WITH THE ADDITION OF A NEW EXTERIOR PERMANENT BAR (520SF) AND REPLACEMENT OF CURTAINWALL. NO ADDED STORIES, NO CHANGE OF OCCUPANCY TYPE, REDUCTION OF 199 OCCUPANTS IN OVERALL BUILDING. ***SEE COMMENTS***
- Permit Issued
- Issued on 6/5/2024
- Issuing Office
- Current Status
- Permit Finaled on 11/25/2024
Permit Application Status History
| Submitted | 12/4/2023 | APPLICANT |
| Assigned to Zoning Architect | 12/7/2023 | MICHAEL LOPEZ |
| Assigned to Plan Check Engineer | 12/7/2023 | JOHNNY WU |
| Corrections Issued | 12/21/2023 | MICHAEL LOPEZ |
| Quality Review Completed | 12/26/2023 | PRANITA SHAH |
| Applicant returned to address corrections | 2/5/2024 | MICHAEL LOPEZ |
| Applicant returned to address corrections | 2/21/2024 | MICHAEL LOPEZ |
| Applicant returned to address corrections | 5/2/2024 | JOHNNY WU |
| Applicant returned to address corrections | 5/3/2024 | JOHNNY WU |
| Applicant returned to address corrections | 5/8/2024 | JOHNNY WU |
| Applicant returned to address corrections | 6/4/2024 | JOHNNY WU |
| Plan Check Approved | 6/5/2024 | JOHNNY WU |
| Issued | 6/5/2024 | APPLICANT |
| Permit Finaled | 11/20/2024 | PAUL BAZERKANIAN |
Permit Application Clearance Information
| CPC | Cleared | 1/30/2024 | RYAN LY |
| CPC | Cleared | 1/30/2024 | RYAN LY |
| CPC | Cleared | 1/30/2024 | RYAN LY |
| Specific Plan | Cleared | 1/30/2024 | SOPHIA KIM |
| ZA Case | Cleared | 1/30/2024 | RYAN LY |
| City owned building/parcel | Cleared | 1/31/2024 | MICHAEL LOPEZ |
| Food Service Establishment | Cleared | 3/15/2024 | RAMESHBHAIR PATEL |
| Green Code | Cleared | 4/23/2024 | MICHAEL AYERS |
| Eng Process Fee Ord 176,300 | Cleared | 4/29/2024 | TREVOR QUAN |
| Sewer availability | Cleared | 4/29/2024 | TREVOR QUAN |
| Food establishment approval | Cleared | 5/6/2024 | LACDHS APPROVED |
| Fire Marshal Fire Life Safety | Cleared | 5/28/2024 | MENOA AGHAJANI |
| DAS Clearance | Cleared | 6/4/2024 | Lawrence Quirante |
| Zoning Plan Check | Cleared | 6/4/2024 | Lawrence Quirante |
Contact Information
| Architect | Chung,, Steven Chen; Lic. No.: NA30725 | , |
| Contractor | Pcl Construction Services Inc; Lic. No.: 474555-B | , |
| Engineer | Towers,, Kevin; Lic. No.: NA6625 | , |
Inspector Information
| JEROME BLACKWOOD, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
| REGINA MENDEZ, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Steel/Welding | 6/12/2024 | Partial Approval | LUIS CCAMACHO |
| Light Gage Steel Frame | 6/18/2024 | Off-Hour Fees Due | |
| Pre-Inspection | 6/18/2024 | Conditional Approval | DARRYL ARNOLD |
| Pre-Inspection | 6/18/2024 | Off-Hour Fees Due | |
| T-Bar Ceiling | 6/18/2024 | Conditional Approval | DARRYL ARNOLD |
| T-Bar Ceiling | 6/18/2024 | Off-Hour Fees Due | |
| Drywall Nailing | 6/20/2024 | Conditional Approval | DARRYL ARNOLD |
| Final | 6/20/2024 | Off-Hour Fees Due | |
| Green Building Final | 6/20/2024 | Off-Hour Fees Due | |
| Light Gage Steel Frame | 6/20/2024 | Conditional Approval | DARRYL ARNOLD |
| Light Gage Steel Frame | 6/20/2024 | Off-Hour Fees Due | |
| SGSOV-Seismic Gas S/O Valve | 6/20/2024 | Off-Hour Fees Due | |
| Smoke Detectors | 6/20/2024 | Off-Hour Fees Due | |
| Drywall Nailing | 6/21/2024 | Partial Approval | MARTIN TAVITIAN |
| Light Gage Steel Frame | 6/21/2024 | Partial Approval | MARTIN TAVITIAN |
| Drywall Nailing | 6/22/2024 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 6/25/2024 | Partial Approval | MARTIN TAVITIAN |
| Light Gage Steel Frame | 6/25/2024 | Partial Approval | MARTIN TAVITIAN |
| Drywall Nailing | 6/26/2024 | Off-Hour Fees Due | |
| Excavation/Setback/Form/Re-Bar | 7/10/2024 | Partial Approval | LUIS CCAMACHO |
| Excavation/Setback/Form/Re-Bar | 7/16/2024 | Partial Approval | ALFREDO LOPEZ |
| Deputy Drilled-In Anchors | 7/24/2024 | Approved | JEROME BLACKWOOD |
| Deputy Reinf. Concrete | 7/24/2024 | Approved | JEROME BLACKWOOD |
| Deputy Steel/Welding | 7/24/2024 | Approved | JEROME BLACKWOOD |
| Excavation/Setback/Form/Re-Bar | 7/24/2024 | Partial Approval | ALFREDO LOPEZ |
| Excavation/Setback/Form/Re-Bar | 7/25/2024 | Approved | DARRYL ARNOLD |
| Excavation/Setback/Form/Re-Bar | 8/7/2024 | Partial Approval | RAFAEL CORTES |
| Deputy Drilled-In Anchors | 8/8/2024 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Concrete | 8/8/2024 | Conditional Approval | MICHAEL ROSENBERG |
| Excavation/Setback/Form/Re-Bar | 8/8/2024 | Partial Approval | RAMAZANALI ALMASI |
| Light Gage Steel Frame | 8/10/2024 | Approved | DARRYL ARNOLD |
| Structural Steel Frame | 8/10/2024 | Approved | DARRYL ARNOLD |
| Excavation/Setback/Form/Re-Bar | 8/12/2024 | Partial Approval | JEROME BLACKWOOD |
| Deputy Drilled-In Anchors | 8/15/2024 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Fireproofing | 8/15/2024 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 8/15/2024 | Conditional Approval | MICHAEL ROSENBERG |
| Drywall Nailing | 8/15/2024 | Partial Approval | RONALD JIMENEZ |
| Floor/Roof Diaphrgm/Shear Wall | 8/15/2024 | Corrections Issued | RONALD JIMENEZ |
| Light Gage Steel Frame | 8/15/2024 | Partial Approval | RONALD JIMENEZ |
| Drywall Nailing | 8/16/2024 | Off-Hour Fees Due | |
| Drywall Nailing | 8/16/2024 | Partial Approval | ALFREDO LOPEZ |
| Light Gage Steel Frame | 8/16/2024 | Off-Hour Fees Due | |
| Light Gage Steel Frame | 8/16/2024 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 8/17/2024 | Approved | DARRYL ARNOLD |
| Drywall Nailing | 8/17/2024 | Conditional Approval | DARRYL ARNOLD |
| Drywall Nailing | 8/17/2024 | Off-Hour Fees Due | |
| Drywall Nailing | 8/18/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 8/24/2024 | Partial Approval | RAMAZANALI ALMASI |
| Excavation/Setback/Form/Re-Bar | 8/24/2024 | Partial Approval | RAMAZANALI ALMASI |
| Drywall Nailing | 8/26/2024 | Partial Approval | ALFREDO LOPEZ |
| Light Gage Steel Frame | 8/26/2024 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 8/30/2024 | Partial Approval | JEROME BLACKWOOD |
| Drywall Nailing | 9/3/2024 | Partial Approval | ALFREDO LOPEZ |
| Light Gage Steel Frame | 9/3/2024 | Partial Approval | ALFREDO LOPEZ |
| T-Bar Ceiling | 9/3/2024 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 9/4/2024 | Partial Approval | LARRY ARNICK |
| Insulation | 9/4/2024 | Partial Approval | LARRY ARNICK |
| Drywall Nailing | 9/6/2024 | Approved | RONALD JIMENEZ |
| Light Gage Steel Frame | 9/6/2024 | Not Ready for Inspection | RONALD JIMENEZ |
| Light Gage Steel Frame | 9/12/2024 | Partial Approval | MARTIN TAVITIAN |
| Wood Frame | 9/12/2024 | Partial Approval | MARTIN TAVITIAN |
| Drywall Nailing | 9/14/2024 | Partial Approval | TIMOTHY POWELL |
| Excavation/Setback/Form/Re-Bar | 9/18/2024 | Partial Approval | RAMAZANALI ALMASI |
| Excavation/Setback/Form/Re-Bar | 9/21/2024 | Approved | RONALD JIMENEZ |
| Footing/Foundation/Slab | 9/23/2024 | Partial Approval | TIMOTHY POWELL |
| Deputy Steel/Welding | 10/1/2024 | Partial Approval | JEROME BLACKWOOD |
| Pre-Inspection | 10/1/2024 | Not Ready for Inspection | JEROME BLACKWOOD |
| Final | 10/16/2024 | Partial Inspection | ALFREDO LOPEZ |
| Green Building Final | 10/16/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| SGSOV-Seismic Gas S/O Valve | 10/16/2024 | SGSOV Not Ready | ALFREDO LOPEZ |
| Smoke Detectors | 10/16/2024 | Not Ready for Inspection | ALFREDO LOPEZ |
| Final | 10/18/2024 | Partial Inspection | TIMOTHY POWELL |
| Green Building Final | 10/18/2024 | Not Ready for Inspection | TIMOTHY POWELL |
| SGSOV-Seismic Gas S/O Valve | 10/18/2024 | SGSOV Not Ready | TIMOTHY POWELL |
| Smoke Detectors | 10/18/2024 | Not Ready for Inspection | TIMOTHY POWELL |
| Final | 10/31/2024 | Not Ready for Inspection | PAUL BAZERKANIAN |
| SGSOV-Seismic Gas S/O Valve | 10/31/2024 | SGSOV Not Ready | PAUL BAZERKANIAN |
| Final | 11/20/2024 | Permit Finaled | PAUL BAZERKANIAN |
| Green Building Final | 11/20/2024 | Approved | PAUL BAZERKANIAN |
| SGSOV-Seismic Gas S/O Valve | 11/20/2024 | SGSOV Approved | PAUL BAZERKANIAN |
| Smoke Detectors | 11/20/2024 | Approved | PAUL BAZERKANIAN |