4461 E HUNTINGTON DR SOUTH 90032

Certificate Information: 4461 E HUNTINGTON DR SOUTH 90032

Application / Permit
23016-20000-41180
Plan Check / Job No.
B23VN16061
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL IN (E) SFD TO THE (E) KITCHEN AND BATHROOMS, WITH PARTIAL REMOVAL OF INTERIOR NON-BEARING WALL, REPLACE (8) WINDOWS SAME SIZE AND SAME LOCATION PER PLAN. "COMPLY WITH DEPARTMENT ORDER effective date 10/09/2023. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
Permit Issued
Issued on 11/30/2023
Issuing Office
Metro
Current Status
Permit Finaled on 12/20/2023

Permit Application Status History

Submitted 11/21/2023 APPLICANT
Assigned to Plan Check Engineer 11/21/2023 ISIS ARGUETA
Corrections Issued 11/21/2023 ISIS ARGUETA
Plan Check Approved 11/29/2023 RAMA DABADGE
Issued 11/30/2023 APPLICANT
Permit Finaled 12/19/2023 PEDRO SIERRA

Permit Application Clearance Information

Grading Pre-Inspection Cleared 11/28/2023 ROBERT PINA

Contact Information

Contractor Owner-Builder       ,
Engineer Roberts,, Jeffrey Allan; Lic. No.: C56881 8325 FOOTHILL BLVD. STE A      SUNLAND, CA 91040

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Final 12/6/2023 Not Ready for Inspection RAUL VASQUEZ
Final 12/6/2023 Not Ready for Inspection RAUL VASQUEZ
Footing/Foundation/Slab 12/6/2023 Not Ready for Inspection RAUL VASQUEZ
PLUMBING-Final 12/6/2023 Not Ready for Inspection RAUL VASQUEZ
SGSOV-Seismic Gas S/O Valve 12/6/2023 SGSOV Not Ready RAUL VASQUEZ
Smoke Detectors 12/6/2023 Not Ready for Inspection RAUL VASQUEZ
Footing/Foundation/Slab 12/8/2023 Approved PEDRO SIERRA
Special/Order Compliance 12/8/2023 Not Ready for Inspection PEDRO SIERRA
Final 12/19/2023 Permit Finaled PEDRO SIERRA
SGSOV-Seismic Gas S/O Valve 12/19/2023 SGSOV Approved PEDRO SIERRA
Smoke Detectors 12/19/2023 Approved PEDRO SIERRA