21 N OAKMONT DR 90049
Certificate Information: 21 N OAKMONT DR 90049
- Application / Permit
- 23016-20000-41060
- Plan Check / Job No.
- B23VN16007
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Exterior and interior alteration to install television lift. All work per engineer details. No change in square footage, no change in height.
- Permit Issued
- Issued on 12/8/2023
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 7/10/2024
Permit Application Status History
| Submitted | 11/20/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 11/27/2023 | JESSE ARELLANO |
| Corrections Issued | 11/28/2023 | JESSE ARELLANO |
| Building Plans Picked Up | 12/5/2023 | APPLICANT |
| Plan Check Approved | 12/8/2023 | VICTOR CHEN |
| Issued | 12/8/2023 | APPLICANT |
| Permit Finaled | 7/9/2024 | KEVIN SARGSYAN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Architect | Kovac,, Jerry Michael; Lic. No.: C19390 | 11828 WEST PICO BLVD LOS ANGELES, CA 90064 |
| Contractor | Balcorp Construction & Development Inc; Lic. No.: 509082-B | 2852 COLORADO AVENUE SANTA MONICA, CA 90404 |
| Engineer | Yamini,, Soly; Lic. No.: C33719 | 540 WARNER AVE LOS ANGELES, CA 90024 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 12/14/2023 | Not Ready for Inspection | KEVIN SARGSYAN |
| Structural Steel Frame | 1/3/2024 | Approved | KEVIN SARGSYAN |
| Wood Frame | 1/3/2024 | Approved | KEVIN SARGSYAN |
| Floor/Roof Diaphrgm/Shear Wall | 1/8/2024 | Approved | KEVIN SARGSYAN |
| Interior/Exterior Lathing | 1/10/2024 | Partial Approval | KEVIN SARGSYAN |
| Drywall Nailing | 1/22/2024 | Partial Approval | HERBERT GIRON |
| Final | 5/20/2024 | No Access for Inspection | KEVIN SARGSYAN |
| SGSOV-Seismic Gas S/O Valve | 5/20/2024 | SGSOV Not Ready | KEVIN SARGSYAN |
| Smoke Detectors | 5/20/2024 | No Access for Inspection | KEVIN SARGSYAN |
| SGSOV-Seismic Gas S/O Valve | 6/27/2024 | SGSOV Not Ready | KEVIN SARGSYAN |
| Final | 7/9/2024 | Permit Finaled | KEVIN SARGSYAN |
| SGSOV-Seismic Gas S/O Valve | 7/9/2024 | SGSOV Approved | KEVIN SARGSYAN |
| Smoke Detectors | 7/9/2024 | Approved | KEVIN SARGSYAN |