6600 S AVALON BLVD 90003

Certificate Information: 6600 S AVALON BLVD 90003

Application / Permit
23016-20000-38924
Plan Check / Job No.
B23VN15213
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(12) Manufacturing
Work Description
REMODEL OF (E) MANUFACTURING BLDG (REMOVAL OF (E) WALLS, (N) 2HR STAIR ENCLOSURE WITH RATED DOORS, (N) ACCESSIBLE RAMP & STAIRS, REPLACE EXT. DISCHARGE STAIR SERVING STAIR #2, RESTRIPE PARKING TO PROVIDE 2 ACCESSIBLE STALLS, & REPLACE GUARDRAIL IN STAIR #1; "COMPLY WITH DEPARTMENT ORDER effective date 04/12/2021. PERMIT WILL EXPIRE 30 DAYS FROM ISSUANCE DATE"
Permit Issued
Issued on 3/8/2024
Issuing Office
Current Status
Issued on 3/8/2024

Permit Application Status History

Submitted 11/6/2023 APPLICANT
Assigned to Plan Check Engineer 11/16/2023 SEAN SHAHMIRI
Corrections Issued 11/29/2023 SEAN SHAHMIRI
Quality Review Completed 11/30/2023 STEVEN KIM
Applicant returned to address corrections 1/26/2024 SEAN SHAHMIRI
Plan Check Approved 2/15/2024 SEAN SHAHMIRI
Issued 3/8/2024 APPLICANT

Permit Application Clearance Information

Green Code Cleared 12/27/2023 MICHAEL AYERS
Historic Resource Verification Cleared 1/5/2024 LAMBERT GIESSINGER
Historic monument Cleared 1/5/2024 LAMBERT GIESSINGER
Community Plan Implem. Overlay Cleared 1/25/2024 HELEN JADALI
Redevelopment Project Area Cleared 1/30/2024 YASMINE BASHIRI
DAS Clearance Cleared 2/12/2024 Lawrence Quirante

Contact Information

Architect Anvar,, Paul H; Lic. No.: C31650 18789 DYLAN STREET      PORTER RANCH, CA 91326
Contractor California Demolition; Lic. No.: 990987-B       ,
Contractor Hawthorne Demolition Corporation; Lic. No.: 990987-B       ,
Engineer Vega,, Cayetano Gonzalez; Lic. No.: C43117 9234 STAMPS AVE      DOWNEY, CA 90240

Inspector Information

PAUL BAZERKANIAN, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
LUIS CCAMACHO, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI
ALAN MORELOS, (213) 482-0353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 5/31/2024 Approved DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 6/12/2024 Conditional Approval DARRYL ARNOLD
Green Building Rough 8/22/2024 Not Ready for Inspection DARRYL ARNOLD
Reinforced Concrete Frame 8/22/2024 Not Ready for Inspection DARRYL ARNOLD
Footing/Foundation/Slab 8/28/2024 Partial Inspection ALFREDO LOPEZ
Footing/Foundation/Slab 9/13/2024 Partial Approval ALFREDO LOPEZ
Structural Steel Frame 11/26/2024 Not Ready for Inspection ALFREDO LOPEZ
Drywall Nailing 3/3/2025 Partial Inspection ALFREDO LOPEZ
Wood Frame 3/3/2025 Partial Inspection ALFREDO LOPEZ
Drywall Nailing 3/10/2025 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 3/10/2025 Partial Approval RONALD JIMENEZ
Drywall Nailing 4/10/2025 Partial Approval ALFREDO LOPEZ
Drywall Nailing 4/14/2025 Approved DARRYL ARNOLD
Insulation 4/14/2025 Conditional Approval DARRYL ARNOLD
Drywall Nailing 4/17/2025 Partial Approval ALFREDO LOPEZ
Insulation 4/17/2025 Partial Approval ALFREDO LOPEZ
Drywall Nailing 5/12/2025 Conditional Approval DARRYL ARNOLD
Wall Anchors 5/12/2025 Approved DARRYL ARNOLD
Green Building Final 7/31/2025 Not Ready for Inspection ALFREDO LOPEZ
Green Building Rough 7/31/2025 Not Ready for Inspection ALFREDO LOPEZ
Reinforced Concrete Frame 7/31/2025 Corrections Issued ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 7/31/2025 SGSOV Not Ready ALFREDO LOPEZ
Smoke Detectors 7/31/2025 Not Ready for Inspection ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 9/11/2025 SGSOV Not Ready ALFREDO LOPEZ