12634 W OXNARD ST 91606

Certificate Information: 12634 W OXNARD ST 91606

Application / Permit
23016-20000-35367
Plan Check / Job No.
B23VN13884
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSED FIRE DAMAGE REPAIR WITHIN EX KITCHEN, DINING RM, UTILITY RM/HALF BATHRM, PORTION OF BEDROOMM, OFFICE PER PLAN. REMOVE AND REPLACE ENTIRE ROOF FRAMING AS EXISTED ("LIKE-FOR-LIKE") REPAIR & ROOF FRAMING PER ENGR DESIGN. SEE COMMENTS.
Permit Issued
Issued on 10/27/2023
Issuing Office
Valley
Current Status
Permit Finaled on 6/12/2024

Permit Application Status History

Submitted 10/10/2023 APPLICANT
Assigned to Plan Check Engineer 10/13/2023 HAYATO TSUCHIYA
Corrections Issued 10/14/2023 HAYATO TSUCHIYA
Building Plans Picked Up 10/17/2023 APPLICANT
Plan Check Approved 10/27/2023 GIOVANNY CHAVEZ
Issued 10/27/2023 APPLICANT
Permit Finaled 6/11/2024 OGANES TARAKHCHYAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,
Engineer Moser,, Bradley Charles; Lic. No.: C68803 116 OAKSIDE LN      BUELLTON, CA 93427

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 11/15/2023 No Access for Inspection KIRK SANDERS
Floor/Roof Diaphrgm/Shear Wall 11/20/2023 Corrections Issued MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 11/28/2023 Partial Approval KIRK SANDERS
ELECTRICAL-Rough 1/4/2024 Corrections Issued JOSE AVILA
Special/Order Compliance 1/4/2024 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 1/29/2024 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 2/2/2024 Approved JOSE AVILA
HVAC-Rough 2/2/2024 Corrections Issued JOSE AVILA
PLUMBING-Rough 2/2/2024 Approved JOSE AVILA
BUILDING-Rough-Frame 2/8/2024 Approved JOSE AVILA
HVAC-Rough 2/8/2024 Approved JOSE AVILA
Insulation 2/8/2024 Approved JOSE AVILA
Final 4/26/2024 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
SGSOV-Seismic Gas S/O Valve 4/26/2024 SGSOV Approved ROBERTO PALACIOS-LOPEZ
Smoke Detectors 4/26/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Final 5/2/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Gas Test 5/2/2024 Approved ROBERTO PALACIOS-LOPEZ
PLUMBING-Final 5/2/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 5/2/2024 Approved ROBERTO PALACIOS-LOPEZ
Smoke Detectors 5/2/2024 Approved ROBERTO PALACIOS-LOPEZ
PLUMBING-Final 5/8/2024 Approved ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 5/8/2024 Approved ROBERTO PALACIOS-LOPEZ
ELECTRICAL-Final 5/17/2024 Corrections Issued JOHN COLEMAN
HVAC-Final 5/17/2024 Corrections Issued JOHN COLEMAN
Final 5/22/2024 Corrections Issued OGANES TARAKHCHYAN
ELECTRICAL-Final 6/7/2024 Approved OGANES TARAKHCHYAN
Final 6/11/2024 Permit Finaled OGANES TARAKHCHYAN