1209 W 56TH ST 90037

Certificate Information: 1209 W 56TH ST 90037

Application / Permit
23016-20000-28878
Plan Check / Job No.
B23VN11574
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Fire Damage Repair of (E) one-story single family dwelling (Replace most of the roof framing, Replace a portion of the wall framing at the kitchen, Replace all plaster/drywall, Replace all wall and attic insulation, Replace the wall heater, Replace the electrical system, Replace the plumbing fixtures, & Replace all the doors and windows); NFPA-13D THRU-OUT
Permit Issued
Issued on 10/12/2023
Issuing Office
Current Status
Permit Finaled on 9/9/2024

Permit Application Status History

Submitted 8/31/2023 APPLICANT
Assigned to Plan Check Engineer 9/14/2023 SEAN SHAHMIRI
Corrections Issued 9/18/2023 SEAN SHAHMIRI
Quality Review Completed 9/22/2023 OMID HEDAYAT
Plan Check Approved 10/12/2023 SEAN SHAHMIRI
Issued 10/12/2023 APPLICANT
Permit Finaled 9/6/2024 SABAS ALONSO

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Coleman Construction Inc; Lic. No.: 697040-B       ,
Contractor Denshaw Inc; Lic. No.: 697040-B       ,
Engineer Miller,, James A; Lic. No.: S4186 4959 PAGUERA CT      SAN DIEGO, CA 92124

Inspector Information

SABAS ALONSO, (213) 202-3468 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/24/2024 Conditional Approval SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 2/14/2024 Approved SABAS ALONSO
BUILDING-Rough-Frame 3/1/2024 Corrections Issued ANTHONY EGSON
ELECTRICAL-Rough 3/1/2024 Not Ready for Inspection ANTHONY EGSON
HVAC-Rough 3/1/2024 Not Ready for Inspection ANTHONY EGSON
PLUMBING-Rough 3/1/2024 Not Ready for Inspection ANTHONY EGSON
Deputy Wood Construction 3/4/2024 Conditional Approval SABAS ALONSO
Deputy Wood Construction 3/7/2024 Conditional Approval SABAS ALONSO
ELECTRICAL-Rough 3/15/2024 Corrections Issued DAVID FEILER
HVAC-Rough 3/15/2024 Not Ready for Inspection DAVID FEILER
PLUMBING-Rough 3/15/2024 Corrections Issued DAVID FEILER
Verify Sprinkler Sign Off 3/19/2024 Corrections Issued SABAS ALONSO
Floor/Roof Diaphrgm/Shear Wall 4/9/2024 Partial Approval SABAS ALONSO
Rough-Elec/Plmb/HVAC 4/9/2024 Corrections Issued SABAS ALONSO
BUILDING-Rough-Frame 4/23/2024 Conditional Approval JOSE MACIAS
HVAC-Rough 4/23/2024 Corrections Issued JOSE MACIAS
PLUMBING-Rough 4/23/2024 Corrections Issued JOSE MACIAS
BUILDING-Rough-Frame 4/26/2024 Not Ready for Inspection SABAS ALONSO
ELECTRICAL-Rough 4/26/2024 Approved SABAS ALONSO
HVAC-Rough 4/26/2024 Approved SABAS ALONSO
PLUMBING-Rough 4/26/2024 Not Ready for Inspection SABAS ALONSO
Shower Pan 4/26/2024 Approved SABAS ALONSO
BUILDING-Rough-Frame 4/29/2024 Approved SABAS ALONSO
Green Building Rough 4/29/2024 Approved SABAS ALONSO
PLUMBING-Rough 4/29/2024 Approved SABAS ALONSO
Insulation 5/1/2024 Approved SABAS ALONSO
Interior/Exterior Lathing 5/1/2024 Partial Approval SABAS ALONSO
Drywall Nailing 5/13/2024 Approved SABAS ALONSO
Final 9/6/2024 Permit Finaled SABAS ALONSO
Green Building Final 9/6/2024 Approved SABAS ALONSO
SGSOV-Seismic Gas S/O Valve 9/6/2024 SGSOV Approved SABAS ALONSO
Smoke Detectors 9/6/2024 Approved SABAS ALONSO