3105 N ELVIDO DR 90049

Certificate Information: 3105 N ELVIDO DR 90049

Application / Permit
23016-20000-27564
Plan Check / Job No.
B23VN10984
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL TO THE (E) SINGLE FAMILY DWELLING. CONVERT PORTION OF THE (E) GARAGE TO A (N) LAUNDRY ROOM. REPLACE EXISTING DOORS AND WINDOWS (SAME SIZE AND SAME LOCATION). REMOVE A PORTION OF THE WALL IN THE (E) KITCHEN AND RAISE THE CEILING IN THE FOYER.
Permit Issued
Issued on 9/27/2023
Issuing Office
Valley
Current Status
CofO Issued on 7/10/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/16/2023 APPLICANT
Assigned to Plan Check Engineer 8/16/2023 GIOVANNY CHAVEZ
Corrections Issued 8/16/2023 GIOVANNY CHAVEZ
Plan Check Approved 9/27/2023 ALEC MOUSAKHANIAN
No Progress 9/27/2023 ALEC MOUSAKHANIAN
Plan Check Approved 9/27/2023 ALEC MOUSAKHANIAN
Issued 9/27/2023 APPLICANT
CofO in Progress 7/5/2024 KEVIN SARGSYAN
Permit Finaled 7/10/2024 DANIEL ORRANTE
CofO Issued 7/10/2024 DANIEL ORRANTE
Permit Finaled 7/10/2024 DANIEL ORRANTE

Permit Application Clearance Information

Grading Pre-Inspection Cleared 8/16/2023 GIOVANNY CHAVEZ
Specific Plan Cleared 9/25/2023 ASHLEY RODARTE
Specific Plan Cleared 9/25/2023 ASHLEY RODARTE

Contact Information

Contractor Owner-Builder       ,
Engineer Burnazyan,, Gegam; Lic. No.: C76761 3625 BEVERLY RIDGE DRIVE      SHERMAN OAKS, CA 91423

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/26/2023 Approved MICHAEL PELHAM
Footing/Foundation/Slab 10/26/2023 Approved MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 11/1/2023 Partial Approval MICHAEL PELHAM
BUILDING-Rough-Frame 11/22/2023 Corrections Issued MICHAEL PELHAM
ELECTRICAL-Rough 11/22/2023 Corrections Issued MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 11/22/2023 Approved MICHAEL PELHAM
Gas Test 11/22/2023 Partial Approval MICHAEL PELHAM
HVAC-Rough 11/22/2023 Corrections Issued MICHAEL PELHAM
PLUMBING-Rough 11/22/2023 Corrections Issued MICHAEL PELHAM
BUILDING-Rough-Frame 11/30/2023 Conditional Approval MICHAEL PELHAM
ELECTRICAL-Rough 11/30/2023 Partial Approval MICHAEL PELHAM
HVAC-Rough 11/30/2023 Approved MICHAEL PELHAM
Insulation 11/30/2023 Approved MICHAEL PELHAM
PLUMBING-Rough 11/30/2023 Partial Approval MICHAEL PELHAM
Drywall Nailing 12/8/2023 Corrections Issued MICHAEL PELHAM
Interior/Exterior Lathing 12/8/2023 Corrections Issued MICHAEL PELHAM
Shower Pan 12/12/2023 Corrections Issued KEVIN SARGSYAN
Shower Pan 12/15/2023 Not Ready for Inspection MICHAEL PELHAM
BUILDING-Rough-Frame 12/20/2023 Approved MICHAEL PELHAM
Drywall Nailing 12/20/2023 Approved MICHAEL PELHAM
ELECTRICAL-Rough 12/20/2023 Approved MICHAEL PELHAM
PLUMBING-Rough 12/20/2023 Approved MICHAEL PELHAM
Shower Pan 12/20/2023 Approved MICHAEL PELHAM
Interior/Exterior Lathing 12/29/2023 Approved MICHAEL PELHAM
ELECTRICAL-Final 6/17/2024 Not Ready for Inspection KEVIN SARGSYAN
Gas Test 6/17/2024 Corrections Issued KEVIN SARGSYAN
HVAC-Final 6/17/2024 Corrections Issued KEVIN SARGSYAN
PLUMBING-Final 6/17/2024 Approved KEVIN SARGSYAN
Service/Power Release 6/17/2024 Corrections Issued KEVIN SARGSYAN
ELECTRICAL-Final 6/27/2024 Approved KEVIN SARGSYAN
Final 6/27/2024 Corrections Issued KEVIN SARGSYAN
Gas Test 6/27/2024 Approved KEVIN SARGSYAN
HVAC-Final 6/27/2024 Approved KEVIN SARGSYAN
PLUMBING-Final 6/27/2024 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 6/27/2024 SGSOV Not Ready KEVIN SARGSYAN
Smoke Detectors 6/27/2024 Approved KEVIN SARGSYAN
Final 7/5/2024 OK to Issue CofO KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 7/5/2024 SGSOV Approved KEVIN SARGSYAN