4939 N SANCOLA AVE 91601

Certificate Information: 4939 N SANCOLA AVE 91601

Application / Permit
23016-20000-24448
Plan Check / Job No.
B23VN09811
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL THROUGHOUT (E) SFD. RELOCATE INTERIOR STAIRS. RELOCATE ONE BEDROOM FROM 1ST FLOOR TO 2ND FLR. ADD TWO NEW BATHROOMS.. RELOCATE LAUNDRY ROOM AND REMODEL KITCHEN.
Permit Issued
Issued on 9/5/2023
Issuing Office
Valley
Current Status
Permit Finaled on 12/24/2024

Permit Application Status History

Submitted 7/24/2023 APPLICANT
Assigned to Plan Check Engineer 7/27/2023 JEROME MAGAT PALMA
Corrections Issued 7/29/2023 JEROME MAGAT PALMA
Building Plans Picked Up 8/14/2023 APPLICANT
Applicant returned to address corrections 9/5/2023 MOHAMMAD ESMAILI
Plan Check Approved 9/5/2023 MOHAMMAD ESMAILI
Issued 9/5/2023 APPLICANT
Permit Finaled 12/24/2024 JOSE AVILA

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,
Engineer Mejia,, Fernando Finuliar; Lic. No.: C54382 8305 DUCOR AVE      WEST HILLS, CA 91304

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Insulation 12/6/2023 Not Ready for Inspection JOHN HAYES
Wood Frame 12/6/2023 Not Ready for Inspection JOHN HAYES
Deputy Drilled-In Anchors 1/12/2024 Conditional Approval DAVID MATSON
Excavation/Setback/Form/Re-Bar 1/24/2024 Corrections Issued JOHN HAYES
Reinforced Concrete Frame 2/8/2024 Partial Approval JOHN HAYES
Excavation/Setback/Form/Re-Bar 2/16/2024 Approved JOHN HAYES
Excavation/Setback/Form/Re-Bar 3/6/2024 Approved JOHN HAYES
Footing/Foundation/Slab 3/6/2024 Approved JOHN HAYES
BUILDING-Rough-Frame 3/14/2024 Partial Approval JOHN HAYES
Piling/Pier/Caisson 3/14/2024 Partial Approval JOHN HAYES
ELECTRICAL-Rough 4/12/2024 Not Ready for Inspection JOHN HAYES
Wood Frame 4/12/2024 Corrections Issued JOHN HAYES
Rough-Elec/Plmb/HVAC 5/31/2024 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 6/10/2024 Corrections Issued JOSE AVILA
PLUMBING-Rough 6/10/2024 Corrections Issued JOSE AVILA
HVAC-Rough 6/12/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Rough 6/14/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
BUILDING-Rough-Frame 6/18/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Rough-Elec/Plmb/HVAC 6/18/2024 Corrections Issued ROBERTO PALACIOS-LOPEZ
Floor/Roof Diaphrgm/Shear Wall 6/25/2024 Partial Approval JOSE AVILA
PLUMBING-Rough 6/25/2024 Approved JOSE AVILA
BUILDING-Rough-Frame 6/27/2024 Approved JOSE AVILA
Drywall Nailing 7/12/2024 Approved RUBEN SALAS
Interior/Exterior Lathing 8/22/2024 Partial Approval JOSE AVILA
Shower Pan 8/23/2024 Approved JOSE AVILA
Shower Pan 8/27/2024 Corrections Issued MICHAEL CORTEZ
Shower Pan 9/3/2024 Corrections Issued MICHAEL CORTEZ
Floor/Roof Diaphrgm/Shear Wall 9/6/2024 Partial Inspection JOSE AVILA
Shower Pan 9/6/2024 Approved JOSE AVILA
Final 12/9/2024 Corrections Issued JOSE AVILA
Final 12/16/2024 Not Ready for Inspection JOSE AVILA
SGSOV-Seismic Gas S/O Valve 12/16/2024 SGSOV Approved JOSE AVILA
Smoke Detectors 12/16/2024 Approved JOSE AVILA
Final 12/24/2024 Permit Finaled JOSE AVILA