12745 W HARTLAND ST 91605

Certificate Information: 12745 W HARTLAND ST 91605

Application / Permit
23016-20000-19208
Plan Check / Job No.
B23VN07705
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN: FIRE DAMAGE REPAIR TO REPAIR (E) INTERIOR WALL AND CEILING FINISHES, REPLACEMENT OF ROOF FRAMING AND EXTERIOR FRAMING, REPLACEMENT OF ROOF SHEATHING/ROOFING, AND REMOVAL AND REPLACEMENT OF SELECT DOORS/WINDOWS PER PLAN. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 8/8/2023
Issuing Office
Current Status
Permit Finaled on 6/5/2024

Permit Application Status History

Submitted 6/19/2023 APPLICANT
Assigned to Plan Check Engineer 6/23/2023 OMAR GARNICA
Plan Check Approved 7/2/2023 OMAR GARNICA
Issued 8/8/2023 APPLICANT
Permit Finaled 6/4/2024 OGANES TARAKHCHYAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor R L D Homes Inc; Lic. No.: 760588-B       ,
Engineer Mellor,, Ian; Lic. No.: S5367 4109 CONRAD DR      SPRING VALLEY, CA 91977

Inspector Information

WAYNE REGESTER, (818) 374-1164 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 12/5/2023 Partial Approval JOSE AVILA
PLUMBING-Rough 12/5/2023 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 12/15/2023 Approved JOSE AVILA
ELECTRICAL-Rough 12/27/2023 Corrections Issued JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 12/28/2023 Not Ready for Inspection JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 12/29/2023 Partial Inspection JOSE AVILA
ELECTRICAL-Rough 1/5/2024 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 1/5/2024 Approved JOSE AVILA
HVAC-Rough 1/5/2024 Approved JOSE AVILA
BUILDING-Rough-Frame 1/16/2024 Approved JOSE AVILA
Insulation 1/16/2024 Approved JOSE AVILA
Interior/Exterior Lathing 1/16/2024 Corrections Issued JOSE AVILA
Drywall Nailing 1/23/2024 Approved JUAN VALENZUELA
ELECTRICAL-Final 5/6/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
Final 5/6/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
Green Building Final 5/6/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
HVAC-Final 5/6/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
PLUMBING-Final 5/6/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
SGSOV-Seismic Gas S/O Valve 5/6/2024 SGSOV Not Ready ROBERTO PALACIOS-LOPEZ
Smoke Detectors 5/6/2024 No Access for Inspection ROBERTO PALACIOS-LOPEZ
Final 5/15/2024 No Access for Inspection OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 5/15/2024 SGSOV Not Ready OGANES TARAKHCHYAN
ELECTRICAL-Final 6/4/2024 Approved OGANES TARAKHCHYAN
Final 6/4/2024 Permit Finaled OGANES TARAKHCHYAN
Green Building Final 6/4/2024 Approved OGANES TARAKHCHYAN
HVAC-Final 6/4/2024 Approved OGANES TARAKHCHYAN
PLUMBING-Final 6/4/2024 Approved OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 6/4/2024 SGSOV Approved OGANES TARAKHCHYAN
Smoke Detectors 6/4/2024 Approved OGANES TARAKHCHYAN