3750 N BENEDICT CANYON LANE 91423

Certificate Information: 3750 N BENEDICT CANYON LANE 91423

Application / Permit
23016-20000-14856
Plan Check / Job No.
B23VN05953
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT (E) STORAGE SPACES TO BEDROOM AND BATHROOM AT 1ST FLOOR, KITCHEN REMODEL TO REMOVE LOAD BEARING WALL AT 2ND FLOOR AND REDUCE WINDOW SIZE, AND REPLACE WINDOWS TO SAME SIZE ON 2ND FLOOR TO (E) S.F.D. ALL WORK PER ENGINEERING
Permit Issued
Issued on 8/11/2023
Issuing Office
Valley
Current Status
Issued on 8/11/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/8/2023 APPLICANT
Assigned to Plan Check Engineer 5/11/2023 JESSE ARELLANO
Corrections Issued 5/13/2023 JESSE ARELLANO
Building Plans Picked Up 5/19/2023 APPLICANT
Applicant returned to address corrections 7/3/2023 PINANK PATEL
Plan Check Approved 7/14/2023 ALFRED RAMIREZ
Issued 8/11/2023 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 6/5/2023 ANTHONY MAINEZ
Sewer availability Cleared 6/5/2023 ANTHONY MAINEZ
Specific Plan Cleared 7/12/2023 JUDE HERNANDEZ
Grading Pre-Inspection Cleared 7/14/2023 ALFRED RAMIREZ

Contact Information

Contractor Mega Solutions Inc; Lic. No.: 1098553-B 750 N SAN VICENTE BLVD SUITE   800W    WEST HOLLYWOOD, CA 90069
Engineer Burnazyan,, Gegam; Lic. No.: C76761 3625 BEVERLY RIDGE DRIVE      SHERMAN OAKS, CA 91423

Inspector Information

MISAEL ESPARZA, (818) 374-1169 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 8/15/2023 Corrections Issued MISAEL ESPARZA
BUILDING-Rough-Frame 8/25/2023 Partial Approval MISAEL ESPARZA
Deputy Wood Construction 8/25/2023 Approved MISAEL ESPARZA
ELECTRICAL-Rough 9/8/2023 Not Ready for Inspection MISAEL ESPARZA
Floor/Roof Diaphrgm/Shear Wall 9/8/2023 Corrections Issued MISAEL ESPARZA
Insulation 9/8/2023 Corrections Issued MISAEL ESPARZA
Deputy Wood Construction 9/11/2023 Conditional Approval JUAN VALENZUELA
BUILDING-Rough-Frame 11/27/2023 Partial Approval MISAEL ESPARZA
Insulation 11/27/2023 Partial Approval MISAEL ESPARZA
Drywall Nailing 12/1/2023 Approved CHRISTOPHER ROJAS
Final 3/15/2024 Corrections Issued MISAEL ESPARZA
Green Building Final 3/15/2024 Not Ready for Inspection MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 3/15/2024 SGSOV Not Ready MISAEL ESPARZA
Smoke Detectors 3/15/2024 Corrections Issued MISAEL ESPARZA
Final 3/27/2024 Not Ready for Inspection MISAEL ESPARZA
Green Building Final 3/27/2024 Not Ready for Inspection MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 3/27/2024 SGSOV Not Ready MISAEL ESPARZA
Smoke Detectors 3/27/2024 Approved MISAEL ESPARZA