1111 S FIGUEROA ST 90015

Certificate Information: 1111 S FIGUEROA ST 90015

Application / Permit
23016-20000-12823
Plan Check / Job No.
B23VN05222
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(4) Sports Arena (unlimited seating capacity)
Work Description
*eplan* PHASE 1 - INSTALLATION OF NEW CONCRETE INFILL WALL BETWEEN THE TWO EXISTING RING BEAMS. EXISTING FRAMING TO REMAIN AS-IS. NEW STUCTURAL WORK IS LOCATED WITHIN EXISTING UNOCCUPIED VOID SPACE. NO CHANGE TO EXISTING FLOOR LAYOUT OR EGRESS.
Permit Issued
Issued on 6/19/2023
Issuing Office
Current Status
Permit Finaled on 6/18/2024

Permit Application Status History

Submitted 4/25/2023 APPLICANT
Assigned to Plan Check Engineer 5/4/2023 JOHNNY WU
Corrections Issued 5/22/2023 JOHNNY WU
Quality Review Completed 5/23/2023 RODOLFO ARIAS
Applicant returned to address corrections 6/1/2023 JOHNNY WU
Applicant returned to address corrections 6/6/2023 JOHNNY WU
Plan Check Approved 6/6/2023 JOHNNY WU
Issued 6/19/2023 APPLICANT
Permit Finaled 6/18/2024 LUIS CCAMACHO

Permit Application Clearance Information

Green Code Cleared 5/10/2023 MICHAEL AYERS
City owned building/parcel Cleared 5/24/2023 JOHNNY WU
DAS Clearance Cleared 6/2/2023 Johnny Wu

Contact Information

Architect Chung,, Steven Chen; Lic. No.: C30725 2017 MANNING AVE      LOS ANGELES, CA 90025
Contractor Pcl Construction Services Inc; Lic. No.: 474555-B       ,
Engineer Towers,, Kevin; Lic. No.: NA6625       ,

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/24/2023 Corrections Issued DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 8/30/2023 Partial Approval DAVID BURKHEAD
Final 10/24/2023 Not Ready for Inspection RAMAZANALI ALMASI
Green Building Final 10/24/2023 Not Ready for Inspection RAMAZANALI ALMASI
SGSOV-Seismic Gas S/O Valve 10/24/2023 SGSOV Not Ready RAMAZANALI ALMASI
Smoke Detectors 10/24/2023 Approved RAMAZANALI ALMASI
Final 6/12/2024 Not Ready for Inspection LUIS CCAMACHO
Green Building Final 6/12/2024 Not Ready for Inspection LUIS CCAMACHO
SGSOV-Seismic Gas S/O Valve 6/12/2024 SGSOV Not Ready LUIS CCAMACHO
Final 6/18/2024 Permit Finaled LUIS CCAMACHO
Green Building Final 6/18/2024 Approved LUIS CCAMACHO
SGSOV-Seismic Gas S/O Valve 6/18/2024 SGSOV Approved LUIS CCAMACHO