1106 N ILIFF ST 90272

Certificate Information: 1106 N ILIFF ST 90272

Application / Permit
23016-20000-10347
Plan Check / Job No.
X23VN03133
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Kitchen/bathroom (2) remodel for residential buildings (no structural changes). Replace drywall (no new walls added) for single family dwellings and duplexes only. Remove existing roof tiles, apply new underlayment and reset roof tiles (Cool roof compliance is not required). Window (7) and door (5) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.
Permit Issued
Issued on 4/6/2023
Issuing Office
Current Status
Permit Finaled on 3/22/2024

Permit Application Status History

Issued 4/6/2023 APPLICANT
Permit Finaled 3/22/2024 ARAM AVEDISIAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Roth Development Group; Lic. No.: 1006385-B 1670 FAIRMOUNT ROAD      WESTLAKE VILLAGE, CA 91362

Inspector Information

TEMISTOCLES CAAL, (213) 653-1908 Office Hours: 7:00-8:00 AM MON-FRI
JESUS PINEDA, (213) 653-1908 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 8/2/2023 Approved OGANES TARAKHCHYAN
HVAC-Rough 8/4/2023 Corrections Issued OGANES TARAKHCHYAN
PLUMBING-Rough 8/4/2023 Corrections Issued OGANES TARAKHCHYAN
PLUMBING-Rough 8/14/2023 Approved OGANES TARAKHCHYAN
HVAC-Rough 9/13/2023 Approved OGANES TARAKHCHYAN
Insulation 10/6/2023 Approved OGANES TARAKHCHYAN
Insulation 10/11/2023 Approved OGANES TARAKHCHYAN
Shower Pan 10/11/2023 Approved OGANES TARAKHCHYAN
Drywall Nailing 10/16/2023 Approved OGANES TARAKHCHYAN
Interior/Exterior Lathing 11/8/2023 Partial Approval KENNETH NAGLE
Interior/Exterior Lathing 11/29/2023 Approved HERBERT GIRON
Final 3/7/2024 Corrections Issued ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 3/7/2024 SGSOV Approved ARAM AVEDISIAN
Smoke Detectors 3/7/2024 Approved ARAM AVEDISIAN
Final 3/22/2024 Permit Finaled ARAM AVEDISIAN