1818 N OUTPOST DR 90068

Certificate Information: 1818 N OUTPOST DR 90068

Application / Permit
23016-20000-03663
Plan Check / Job No.
B23VN01600
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR REMODEL OF AN EXISTING 2-STORY SFD. REPLACE DOORS & WINDOWS PER PLANS.
Permit Issued
Issued on 3/23/2023
Issuing Office
Metro
Current Status
Permit Finaled on 7/16/2024

Permit Application Status History

Submitted 2/9/2023 APPLICANT
Assigned to Plan Check Engineer 2/15/2023 ARTIN ZARUKIAN
Corrections Issued 2/18/2023 ARTIN ZARUKIAN
Building Plans Picked Up 2/23/2023 APPLICANT
Plan Check Approved 3/15/2023 MIROOSH KHACHATOORIAN
Issued 3/23/2023 APPLICANT
Permit Finaled 7/15/2024 BRIAN SULLIVAN

Permit Application Clearance Information

Grading Pre-Inspection Cleared 2/27/2023 KIRK LINKLATER

Contact Information

Contractor B & R Creative Builders Inc; Lic. No.: 969864-B 6820 LA TIJERA BLVD STE 111      LOS ANGELES, CA 90045
Engineer Adzhemyan,, Arsen; Lic. No.: C89103 1010 RALEIGH ST APT 107      GLENDALE, CA 91205

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/17/2023 Corrections Issued BRIAN SULLIVAN
Footing/Foundation/Slab 4/24/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Rough 5/22/2023 Not Ready for Inspection BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 5/22/2023 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Rough 5/22/2023 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Rough 5/22/2023 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 5/26/2023 Corrections Issued BRIAN SULLIVAN
BUILDING-Rough-Frame 6/7/2023 Conditional Approval BRIAN SULLIVAN
ELECTRICAL-Rough 6/7/2023 Approved BRIAN SULLIVAN
HVAC-Rough 6/7/2023 Approved BRIAN SULLIVAN
PLUMBING-Rough 6/7/2023 Approved BRIAN SULLIVAN
Drywall Nailing 7/18/2023 Conditional Approval BRIAN SULLIVAN
Shower Pan 7/18/2023 Approved BRIAN SULLIVAN
ELECTRICAL-Final 5/15/2024 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 7/1/2024 SGSOV Not Ready BRIAN SULLIVAN
ELECTRICAL-Final 7/2/2024 Partial Inspection BRIAN SULLIVAN
HVAC-Final 7/2/2024 Partial Inspection BRIAN SULLIVAN
PLUMBING-Final 7/2/2024 Partial Inspection BRIAN SULLIVAN
ELECTRICAL-Final 7/15/2024 Approved BRIAN SULLIVAN
Final 7/15/2024 Permit Finaled BRIAN SULLIVAN
HVAC-Final 7/15/2024 Approved BRIAN SULLIVAN
PLUMBING-Final 7/15/2024 Approved BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 7/15/2024 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 7/15/2024 Approved BRIAN SULLIVAN