981 S ST ANDREWS PL 90019

Certificate Information: 981 S ST ANDREWS PL 90019

Application / Permit
23016-20000-03362
Plan Check / Job No.
X23VN01206
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(35) Condo-Single Family
Work Description
Window ( 10) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24.Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing (1 ) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B.
Permit Issued
Issued on 2/7/2023
Issuing Office
Valley
Current Status
Permit Finaled on 6/8/2023

Permit Application Status History

Issued 2/7/2023 APPLICANT
Permit Finaled 6/6/2023 ALFREDO LOPEZ

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Greenpro Con; Lic. No.: 865951-B 444 S OCCIDENTAL BLVD #204      LOS ANGELES, CA 90057

Inspector Information

IAN BLINN, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI
CHRISTOPHER BLACKWOOD, (213) 482-7361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Interior/Exterior Lathing 2/9/2023 Corrections Issued ALFREDO LOPEZ
Wood Frame 2/9/2023 Partial Inspection ALFREDO LOPEZ
Interior/Exterior Lathing 2/15/2023 Not Ready for Inspection ALFREDO LOPEZ
Interior/Exterior Lathing 2/24/2023 Partial Inspection ALFREDO LOPEZ
Interior/Exterior Lathing 3/7/2023 Partial Inspection ALFREDO LOPEZ
Floor/Roof Diaphrgm/Shear Wall 3/9/2023 Approved VAHE KELEDJIAN
Final 4/21/2023 Partial Inspection ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 4/21/2023 SGSOV Not Ready ALFREDO LOPEZ
Smoke Detectors 4/21/2023 Not Ready for Inspection ALFREDO LOPEZ
Final 5/24/2023 Partial Inspection ALFREDO LOPEZ
SGSOV-Seismic Gas S/O Valve 5/24/2023 SGSOV Approved ALFREDO LOPEZ
Smoke Detectors 5/24/2023 Not Ready for Inspection ALFREDO LOPEZ
Final 6/6/2023 Permit Finaled ALFREDO LOPEZ
Smoke Detectors 6/6/2023 Approved ALFREDO LOPEZ