824 S BONNIE BRAE ST 90057

Certificate Information: 824 S BONNIE BRAE ST 90057

Application / Permit
23016-10001-20991
Plan Check / Job No.
B23LA23091
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
SUPPLEMENTAL PERMIT TO 23016-10000-20991 TO ADD ADDITIONAL SCOPE OF WORK TO REPAIR AND REPLACE ENTIRE ROOF STRUCTURE, INTERIOR WALLS AND PORTION OF EXTERIOR WALL AT REAR
Permit Issued
Issued on 5/3/2024
Issuing Office
Metro
Current Status
Issued on 5/3/2024

Permit Application Status History

Submitted 12/7/2023 APPLICANT
Assigned to Plan Check Engineer 12/11/2023 GEORGE ALVAREZ
Corrections Issued 12/11/2023 GEORGE ALVAREZ
Plan Check Approved 5/3/2024 MINA HABILI
Issued 5/3/2024 APPLICANT

Permit Application Clearance Information

City Hist. Cultural Monument Cleared 12/15/2023 LAMBERT GIESSINGER
Historic Resource Verification Cleared 12/15/2023 LAMBERT GIESSINGER
Historic monument Cleared 12/15/2023 LAMBERT GIESSINGER
Tenant Habitability Plan Cleared 12/19/2023 HUGO GARRIDO GARZA
Redevelopment Project Area Cleared 12/22/2023 YASMINE BASHIRI
Roof/Waste drainage to street Cleared 12/23/2023 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 12/28/2023 ADRIAN SANCHEZ
Encroachment in public way Cleared 3/11/2024 MARK REYES
Construction near power lines Cleared 4/27/2024 RIDWAN HARDY

Contact Information

Contractor Trinity Cmd Inc; Lic. No.: 1066192-B 10911 GARDEN GROVE AVE      NORTHRIDGE, CA 91326
Engineer Park,, Juntae; Lic. No.: C65104 3055 WILSHIRE BLVD 880      LOS ANGELES, CA 90010

Inspector Information

WILLIAM SIERRA, (213) 202-3122 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 9/16/2024 Partial Approval JOHN QUINTANILLA
Deputy Drilled-In Anchors 10/24/2024 No Result Entered WILLIAM KUEHN
Floor/Roof Diaphrgm/Shear Wall 11/19/2024 Approved WILLIAM SIERRA
Footing/Foundation/Slab 11/19/2024 Approved WILLIAM SIERRA
Interior/Exterior Lathing 11/26/2024 Partial Approval WILLIAM SIERRA
BUILDING-Rough-Frame 4/24/2025 Corrections Issued WILLIAM SIERRA
BUILDING-Rough-Frame 5/1/2025 Approved WILLIAM SIERRA
Insulation 5/1/2025 Approved WILLIAM SIERRA
Drywall Nailing 5/19/2025 Approved WILLIAM SIERRA