8207 W CLINTON ST 90048

Certificate Information: 8207 W CLINTON ST 90048

Application / Permit
23016-10000-42095
Plan Check / Job No.
B23LA22547
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EXTERIOR AND INTERIOR REMODEL TO EXISTING 1 STORY SINGLE FAMILY DEWLLING. NEW OPEN WOOD DECKS AT REAR BUILDING, NEW EXTERIOR STUCCO (no change in floor area or height)
Permit Issued
Issued on 1/18/2024
Issuing Office
Metro
Current Status
Permit Finaled on 7/24/2025

Permit Application Status History

Submitted 11/29/2023 APPLICANT
Assigned to Plan Check Engineer 12/4/2023 AUNG SOE
Corrections Issued 12/7/2023 AUNG SOE
Building Plans Picked Up 12/8/2023 APPLICANT
Issued 1/18/2024 APPLICANT
Permit Finaled 7/23/2025 JOSE MACIAS

Permit Application Clearance Information

Construction near power lines Cleared 1/3/2024 OSCAR CASTRO
Construction within easement Cleared 1/3/2024 OSCAR CASTRO

Contact Information

Contractor By Roger Perron Inc; Lic. No.: 416079-B 3171 LOS FELIZ BLVD 306      LOS ANGELES, CA 90039
Engineer Simonian,, Ara; Lic. No.: C37208 314 E BROADWAY STE A      GLENDALE, CA 91205

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 3/26/2024 Corrections Issued AMIR NAZARIAN
Footing/Foundation/Slab 3/26/2024 Corrections Issued AMIR NAZARIAN
HVAC-Rough 3/26/2024 Corrections Issued AMIR NAZARIAN
PLUMBING-Rough 3/26/2024 Approved AMIR NAZARIAN
Deputy Drilled-In Anchors 4/4/2024 No Access for Inspection AMIR NAZARIAN
BUILDING-Rough-Frame 4/19/2024 Conditional Approval AMIR NAZARIAN
ELECTRICAL-Rough 4/19/2024 Not Ready for Inspection AMIR NAZARIAN
HVAC-Rough 4/19/2024 Not Ready for Inspection AMIR NAZARIAN
PLUMBING-Rough 4/19/2024 Approved AMIR NAZARIAN
Shower Pan 4/19/2024 Corrections Issued AMIR NAZARIAN
BUILDING-Rough-Frame 5/3/2024 Corrections Issued AMIR NAZARIAN
Interior/Exterior Lathing 5/3/2024 Partial Approval AMIR NAZARIAN
Rough-Elec/Plmb/HVAC 5/3/2024 Corrections Issued AMIR NAZARIAN
Insulation 5/10/2024 Conditional Approval AMIR NAZARIAN
Drywall Nailing 6/10/2024 Corrections Issued AMIR NAZARIAN
Shower Pan 6/10/2024 Approved AMIR NAZARIAN
Drywall Nailing 6/18/2024 Corrections Issued AMIR NAZARIAN
Footing/Foundation/Slab 6/18/2024 Corrections Issued AMIR NAZARIAN
Drywall Nailing 6/21/2024 Approved AMIR NAZARIAN
Footing/Foundation/Slab 6/21/2024 Approved AMIR NAZARIAN
BUILDING-Rough-Frame 6/26/2024 Approved AMIR NAZARIAN
Interior/Exterior Lathing 7/5/2024 Approved AMIR NAZARIAN
Deck 9/24/2024 Approved JOSE MACIAS
SGSOV-Seismic Gas S/O Valve 5/12/2025 SGSOV Approved ENRIQUE MIRELES
Smoke Detectors 5/12/2025 Approved ENRIQUE MIRELES
Final 6/24/2025 Corrections Issued JOSE MACIAS
Insulation 6/24/2025 Approved JOSE MACIAS
Final 7/23/2025 Permit Finaled JOSE MACIAS