4325 S VAN NESS AVE 90062
Certificate Information: 4325 S VAN NESS AVE 90062
- Application / Permit
- 23016-10000-42016
- Plan Check / Job No.
- B23LA22502
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- INTERIOR REMODEL OF (E) SFD INCLUDING FLOORING, CEILING AND FINISHES. REMOVE AND REPLACE WINDOWS AND DOORS (SAME SIZE AND LOCATION). INFILL (3) WINDOWS AND REMOVE PARTIAL WALLS BETWEEN (E) KITCHEN AND DINING ROOM.
- Permit Issued
- Issued on 11/30/2023
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 2/8/2024
Permit Application Status History
| Submitted | 11/29/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 11/29/2023 | CRISTINA SALAZAR |
| Plan Check Approved | 11/29/2023 | CRISTINA SALAZAR |
| Issued | 11/30/2023 | APPLICANT |
| Permit Finaled | 2/8/2024 | ANTHONY EGSON |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Arreaga Construction Inc; Lic. No.: 1064497-B | 4324 ARLINGTON AVE LOS ANGELES, CA 90008 |
| Engineer | Melchor,, Oscar Elias; Lic. No.: C76828 | 21243 VENTURA BLVD SUITE 119 WOODLAND HILLS, CA 91364 |
Inspector Information
| LUIS CASTRO, (213) 202-3436 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Drilled-In Anchors | 12/5/2023 | Conditional Approval | BRENDAN MORELLI |
| ELECTRICAL-Rough | 12/6/2023 | Approved | ANTHONY EGSON |
| Footing/Foundation/Slab | 12/6/2023 | Not Ready for Inspection | ANTHONY EGSON |
| HVAC-Rough | 12/6/2023 | Not Ready for Inspection | ANTHONY EGSON |
| PLUMBING-Rough | 12/6/2023 | Not Ready for Inspection | ANTHONY EGSON |
| HVAC-Rough | 12/11/2023 | Corrections Issued | ANTHONY EGSON |
| PLUMBING-Rough | 12/11/2023 | Approved | ANTHONY EGSON |
| Wood Frame | 12/14/2023 | Corrections Issued | ANTHONY EGSON |
| Wood Frame | 12/22/2023 | Partial Inspection | CRAIG DAVIS |
| HVAC-Rough | 1/2/2024 | Approved | ANTHONY EGSON |
| Interior/Exterior Lathing | 1/2/2024 | Approved | ANTHONY EGSON |
| Wood Frame | 1/2/2024 | Approved | ANTHONY EGSON |
| Insulation | 1/3/2024 | Approved | ANTHONY EGSON |
| Drywall Nailing | 1/10/2024 | Approved | ANTHONY EGSON |
| Final | 2/8/2024 | Permit Finaled | ANTHONY EGSON |
| SGSOV-Seismic Gas S/O Valve | 2/8/2024 | SGSOV Approved | ANTHONY EGSON |
| Smoke Detectors | 2/8/2024 | Approved | ANTHONY EGSON |