5923 1/2 S HAAS AVE 90047

Certificate Information: 5923 1/2 S HAAS AVE 90047

Application / Permit
23016-10000-40380
Plan Check / Job No.
B23LA21819
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: SUPPLEMENTAL TO PCIS #21016-20000-25394 to Revise plans due to change in scope of work from garage conversion to ADU per CA Govt. Code 65852.2(e)(1)(A) To (N) Detached ADU Per CA Govt. Code 65852.2(e)(1)(B) and applicable part2 of LAMC 12.22 A.33 (c)-(d), (g) Comply with Department Order effective date 03/14/2020. If additional assistance is needed please call Senior Inspector MICHAEL SCHULZINGER at (213)252-3962. CEIS Case Number is 896160.
Permit Issued
Issued on 6/3/2024
Issuing Office
Current Status
Permit Finaled on 4/8/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/17/2023 APPLICANT
Assigned to Plan Check Engineer 11/17/2023 ALFREDO JARA
Corrections Issued 11/19/2023 ALFREDO JARA
Applicant returned to address corrections 12/1/2023 ALFREDO JARA
Applicant returned to address corrections 12/8/2023 ALFREDO JARA
Applicant returned to address corrections 5/25/2024 AMY GUEVARRA
Plan Check Approved 6/2/2024 AMY GUEVARRA
Issued 6/3/2024 APPLICANT
CofO in Progress 3/27/2025 GABRIEL HERRERA
Permit Finaled-Status Void 4/7/2025 HAGOP BADOSSIAN
No Progress 4/7/2025 HAGOP BADOSSIAN
CofO in Progress 4/7/2025 HAGOP BADOSSIAN
Re-Activate Permit 4/8/2025 HAGOP BADOSSIAN
Permit Finaled 4/8/2025 HAGOP BADOSSIAN

Permit Application Clearance Information

CPC Cleared 2/5/2024 ASHLEY RODARTE
Address approval Cleared 2/6/2024 AMBER CAMPBELL
Eng Process Fee Ord 176,300 Cleared 2/22/2024 AMBER CAMPBELL
Sewer availability Cleared 2/22/2024 AMBER CAMPBELL
Construction near power lines Cleared 5/17/2024 RIDWAN HARDY

Contact Information

Contractor Owner-Builder       ,
Engineer Castillo,, Margarito; Lic. No.: S4808 1205 PINE AVE   SUITE 201    LONG BEACH, CA 90813

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Underground Mechanical 6/6/2024 Approved GABRIEL HERRERA
Excavation/Setback/Form/Re-Bar 6/11/2024 Approved GABRIEL HERRERA
Footing/Foundation/Slab 6/11/2024 Approved GABRIEL HERRERA
METHANE-Barrier 6/11/2024 Approved GABRIEL HERRERA
METHANE-Subgrade 6/11/2024 Approved GABRIEL HERRERA
Floor/Roof Diaphrgm/Shear Wall 6/18/2024 Approved GABRIEL HERRERA
Interior/Exterior Lathing 7/12/2024 Approved GABRIEL HERRERA
Rough-Elec/Plmb/HVAC 7/15/2024 Approved GABRIEL HERRERA
Insulation 7/18/2024 Approved GABRIEL HERRERA
Shower Pan 7/18/2024 Approved GABRIEL HERRERA
Drywall Nailing 7/19/2024 Approved GABRIEL HERRERA
Interior/Exterior Lathing 7/19/2024 Approved GABRIEL HERRERA
Sewer 8/2/2024 Approved GABRIEL HERRERA
Underground Mechanical 8/2/2024 Approved GABRIEL HERRERA
BUILDING-Rough-Frame 10/3/2024 Approved GABRIEL HERRERA
Final 10/3/2024 Conditional Approval GABRIEL HERRERA
Green Building Final 10/3/2024 Approved GABRIEL HERRERA
Green Building Rough 10/3/2024 Approved GABRIEL HERRERA
METHANE-Final 10/3/2024 Approved GABRIEL HERRERA
METHANE-Rough 10/3/2024 Approved GABRIEL HERRERA
SGSOV-Seismic Gas S/O Valve 10/3/2024 SGSOV Approved GABRIEL HERRERA
Service/Power Release 10/3/2024 Approved GABRIEL HERRERA
Smoke Detectors 10/3/2024 Approved GABRIEL HERRERA
Verify Sprinkler Sign Off 10/3/2024 Conditional Approval GABRIEL HERRERA
Final 3/27/2025 OK to Issue CofO GABRIEL HERRERA
Final 4/7/2025 Conditional Approval HAGOP BADOSSIAN
Special/Order Compliance 4/7/2025 Conditional Approval HAGOP BADOSSIAN
Final 4/8/2025 Permit Finaled HAGOP BADOSSIAN
METHANE-Final 4/8/2025 Approved HAGOP BADOSSIAN