5932 W CENTURY BLVD 90045

Certificate Information: 5932 W CENTURY BLVD 90045

Application / Permit
23016-10000-39829
Plan Check / Job No.
B23LA21465
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(3) Airport Building
Work Description
**LAX PROJECT** THE PROJECT ADDS THREE NEW HIGH-SPEED OVERHEAD DOORS WITHIN THE CURRENT UNITED LAX CARGO FACILITY AT EXISTING AOA FENCE LINE OPENINGS. THE PROPOSED NEW DOORS ARE ALL LOCATED ON GRID LINE C. DOOR A WILL BE LOCATED BETWEEN GRID LINES 10 AND 11; DOOR B WILL BE LOCATED BETWEEN GRID LINES 3 AND 4; AND DOOR C WILL BE LOCATED BETWEEN GRID LINES 1 AND 2. NEW TUBE STEEL FRAMES WILL BE ERECTED AT EACH DOOR. MINOR PATCHING AND REPAIR OF EXISTING FLOOR AND WALLS WILL BE MADE AS NECESSARY. NEW CCTV CAMERAS WILL BE PROVIDED AS REQUIRED BY AIRPORT POLICE AT EACH OF THE THREE LOCATIONS. NO NEW SQUARE FOOTAGE WILL BE ADDED AS PART OF THIS PROJECT.
Permit Issued
Issued on 3/13/2024
Issuing Office
Current Status
Permit Finaled on 4/11/2025

Permit Application Status History

Submitted 11/15/2023 APPLICANT
Assigned to Plan Check Engineer 11/21/2023 FARSHAD ALIMOHAMADI
Corrections Issued 11/27/2023 FARSHAD ALIMOHAMADI
Quality Review Completed 11/29/2023 LIPING TENG
Applicant returned to address corrections 12/22/2023 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 12/31/2023 FARSHAD ALIMOHAMADI
Plan Check Approved 2/13/2024 FARSHAD ALIMOHAMADI
Issued 3/13/2024 APPLICANT
Permit Finaled 4/11/2025 NICK LAROCCA

Permit Application Clearance Information

Green Code Cleared 12/4/2023 Lily Teng
Project Permit Cleared 12/18/2023 MERCEDES ORTIZ
City owned building/parcel Cleared 1/11/2024 FARSHAD ALIMOHAMADI
DAS Clearance Cleared 1/25/2024 Lily Teng
Airport buildings Cleared 2/1/2024 ANDREW KO

Contact Information

Architect Rivers,, Steven Ramsey; Lic. No.: NA8068       ,
Contractor Pcl Construction Services Inc; Lic. No.: 474555-B       ,
Engineer Nadal,, Mark; Lic. No.: NA5494       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 7/18/2024 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 7/18/2024 Conditional Approval GRANT WOODS
Deputy Drilled-In Anchors 7/19/2024 Conditional Approval GRANT WOODS
Deputy Reinf. Concrete 7/19/2024 Conditional Approval GRANT WOODS
Deputy Drilled-In Anchors 7/22/2024 Conditional Approval RICARDO ROBLES
Deputy Reinf. Concrete 7/22/2024 Conditional Approval RICARDO ROBLES
Deputy Drilled-In Anchors 7/23/2024 Conditional Approval RICARDO ROBLES
Deputy Reinf. Concrete 7/23/2024 Conditional Approval RICARDO ROBLES
Deputy Drilled-In Anchors 7/24/2024 Conditional Approval ALAN NOVAK
Deputy Reinf. Concrete 7/24/2024 Conditional Approval ALAN NOVAK
Structural Steel Frame 7/26/2024 Not Ready for Inspection ALAN NOVAK
Deputy Drilled-In Anchors 7/29/2024 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 7/29/2024 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 7/30/2024 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 7/30/2024 Conditional Approval ALAN NOVAK
Structural Steel Frame 7/30/2024 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 8/1/2024 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 8/1/2024 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 8/2/2024 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/5/2024 Approved NICK LAROCCA
Deputy Drilled-In Anchors 8/6/2024 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 8/7/2024 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 8/8/2024 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 8/8/2024 Conditional Approval ALAN NOVAK
Deputy Drilled-In Anchors 8/9/2024 Conditional Approval ALAN NOVAK
Deputy Steel/Welding 8/9/2024 Conditional Approval ALAN NOVAK
Pre-Inspection 8/23/2024 Approved ALAN NOVAK
Final 4/11/2025 Permit Finaled NICK LAROCCA
Green Building Final 4/11/2025 Approved NICK LAROCCA
SGSOV-Seismic Gas S/O Valve 4/11/2025 SGSOV Approved NICK LAROCCA
Smoke Detectors 4/11/2025 Approved NICK LAROCCA