157 N GARDNER ST 90036

Certificate Information: 157 N GARDNER ST 90036

Application / Permit
23016-10000-38189
Plan Check / Job No.
B23LA20561
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ePlan: Interior remodel to (E) sfd, Remodel kitchen, Enlarge (e) window openings , Add 1/2 bath (no new square footage). Reconfigure (E) 3/4 bath. Modify interior closet layouts. Replace two existing exterior windows. all work per eng.
Permit Issued
Issued on 1/15/2024
Issuing Office
Current Status
Permit Finaled on 10/24/2024

Permit Application Status History

Submitted 10/31/2023 APPLICANT
Assigned to Plan Check Engineer 11/2/2023 LUISANGEL VALENZUELA
Corrections Issued 11/3/2023 LUISANGEL VALENZUELA
Plan Check Approved 12/19/2023 LUISANGEL VALENZUELA
Issued 1/15/2024 APPLICANT
Permit Finaled 10/23/2024 JOSE MACIAS

Permit Application Clearance Information

CPC Cleared 11/13/2023 NOAH MCCOY
Miscellaneous Cleared 11/13/2023 NOAH MCCOY
HPOZ Cleared 12/14/2023 DAMIAN GATTO
ZI Cleared 12/14/2023 DAMIAN GATTO
ZI Cleared 12/14/2023 DAMIAN GATTO

Contact Information

Contractor Ind Construction Llc; Lic. No.: 937833-B       ,
Engineer Burnazyan,, Gegam; Lic. No.: C76761 3625 BEVERLY RIDGE DRIVE      SHERMAN OAKS, CA 91423

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 2/16/2024 Approved AMIR NAZARIAN
ELECTRICAL-Rough 3/21/2024 Corrections Issued AMIR NAZARIAN
HVAC-Rough 3/21/2024 Approved AMIR NAZARIAN
PLUMBING-Rough 3/21/2024 Corrections Issued AMIR NAZARIAN
Wood Frame 3/21/2024 Corrections Issued AMIR NAZARIAN
ELECTRICAL-Rough 3/29/2024 Corrections Issued AMIR NAZARIAN
HVAC-Rough 3/29/2024 Approved AMIR NAZARIAN
PLUMBING-Rough 3/29/2024 Approved AMIR NAZARIAN
Wood Frame 3/29/2024 Approved AMIR NAZARIAN
Insulation 4/5/2024 Approved AMIR NAZARIAN
Interior/Exterior Lathing 4/5/2024 Approved AMIR NAZARIAN
Shower Pan 4/5/2024 Approved AMIR NAZARIAN
Drywall Nailing 4/16/2024 Approved AMIR NAZARIAN
Final 7/25/2024 Corrections Issued AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 7/25/2024 SGSOV Approved AMIR NAZARIAN
Smoke Detectors 7/25/2024 Approved AMIR NAZARIAN
Final 7/30/2024 Corrections Issued AMIR NAZARIAN
Special/Order Compliance 7/30/2024 Partial Approval NICHOLAS LOPEZ
Final 9/20/2024 Corrections Issued JOSE MACIAS
Final 10/23/2024 Permit Finaled JOSE MACIAS