680 W 16TH ST 90731

Certificate Information: 680 W 16TH ST 90731

Application / Permit
23016-10000-36495
Plan Check / Job No.
B23LA19556
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Eplan: Soft-Story seismic retrofit per LABC Chapter 93: Install New Wood shear wall at 1st floor garage area to comply with Soft Story ordinance. Separate permit was obtained under permit 23014-10000-03279 to build a new ADU addition over existing first floor garage. Propose ADU addition is attached to existing apartment building on second floor.
Permit Issued
Issued on 4/24/2024
Issuing Office
Current Status
CofC Issued on 11/12/2025

Permit Application Status History

Submitted 10/17/2023 APPLICANT
Assigned to Plan Check Engineer 10/26/2023 HANS SANTIAGO
Corrections Issued 10/30/2023 HANS SANTIAGO
Quality Review Completed 11/13/2023 CHARMIE HUYNH
Applicant returned to address corrections 12/12/2023 HANS SANTIAGO
Plan Check Approved 1/19/2024 ANDREW SANTIAGO
Issued 4/24/2024 APPLICANT
OK for CofC 11/6/2025 DARRYL ARNOLD
CofC Issued 11/12/2025 ERNESTO CORRAL

Permit Application Clearance Information

Tenant Habitability Plan Cleared 4/4/2024 RICARDO BOHORQUEZ

Contact Information

Contractor Mg Elite Construction; Lic. No.: 1098511-B 400 N VALENCIA ST      LA HABRA, CA 90631
Engineer Castillo,, Margarito; Lic. No.: S4808 1205 PINE AVE   SUITE 201    LONG BEACH, CA 90813

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 6/24/2024 Corrections Issued JOEY BUCHANAN
Footing/Foundation/Slab 7/30/2024 Partial Inspection AMANUEL BERHE
Footing/Foundation/Slab 8/20/2024 Partial Inspection AMANUEL BERHE
Deputy Drilled-In Anchors 9/27/2024 Conditional Approval JOEY BUCHANAN
Footing/Foundation/Slab 9/27/2024 Approved JOEY BUCHANAN
Special/Order Compliance 1/21/2025 Corrections Issued MICHAEL PETRUSKO
Floor/Roof Diaphrgm/Shear Wall 2/4/2025 Corrections Issued JOEY BUCHANAN
Wood Frame 8/4/2025 Corrections Issued MICHAEL PETRUSKO
Wood Frame 8/5/2025 Corrections Issued MICHAEL PETRUSKO
Insulation 8/7/2025 Approved RICARDO ROBLES
Drywall Nailing 8/13/2025 Approved MICHAEL PETRUSKO
Floor/Roof Diaphrgm/Shear Wall 8/13/2025 Conditional Approval MICHAEL PETRUSKO
Interior/Exterior Lathing 8/28/2025 Approved RICARDO ROBLES
Final 9/23/2025 Not Ready for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 9/23/2025 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 9/23/2025 Not Ready for Inspection MICHAEL PETRUSKO
Final 10/7/2025 Not Ready for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 10/7/2025 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 10/7/2025 Not Ready for Inspection MICHAEL PETRUSKO
Final 10/14/2025 Not Ready for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 10/14/2025 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 10/14/2025 Not Ready for Inspection MICHAEL PETRUSKO
Final 10/17/2025 Not Ready for Inspection MICHAEL PETRUSKO
SGSOV-Seismic Gas S/O Valve 10/17/2025 SGSOV Not Ready MICHAEL PETRUSKO
Smoke Detectors 10/17/2025 Not Ready for Inspection MICHAEL PETRUSKO
Final 11/6/2025 OK for CofC DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 11/6/2025 SGSOV Approved DARRYL ARNOLD
Smoke Detectors 11/6/2025 Approved DARRYL ARNOLD