8721 W SUNSET PLAZA TER 90069
Certificate Information: 8721 W SUNSET PLAZA TER 90069
- Application / Permit
- 23016-10000-36336
- Plan Check / Job No.
- B23LA19485
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- eplan INTERIOR REMODEL TO EXISTING 2-STORY SINGLE FAMILY DWELLING WITH ONE LEVEL OF BASEMENT ATTACHED GARAGE REPLACEMENT OF EXISTING FINISHES, DOORS , WINDOWS WITH NEW MATCHING SIZE. RELOCATION OF THE EXISTING STAIRCASE IN THE GARAGE LEVEL (E) STRUCTURE EQUIPED WITH FIRE SPRINKLER NFPA13D NO CHANGE IN FLOOR AREA, HEIGHT OR DIMENSION OF EXISTING STRUCTURE
- Permit Issued
- Issued on 1/9/2024
- Issuing Office
- Current Status
- Permit Finaled on 8/27/2025
Permit Application Status History
| Submitted | 10/17/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 10/19/2023 | JAD BASMA |
| Corrections Issued | 10/21/2023 | JAD BASMA |
| Quality Review Completed | 10/24/2023 | PRANITA SHAH |
| Applicant returned to address corrections | 12/5/2023 | JAD BASMA |
| Plan Check Approved | 12/27/2023 | JAD BASMA |
| Issued | 1/9/2024 | APPLICANT |
| Permit Finaled | 8/27/2025 | ROY SPAULDING |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 12/15/2023 | VASIL MIHALEV |
Contact Information
| Contractor | Olyaee Bahman; Lic. No.: 842261-B | , |
| Engineer | Tajvidi,, Seyed Mohammad; Lic. No.: NA84559 | , |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 5/13/2024 | Partial Approval | ROY SPAULDING |
| Deputy Wood Construction | 5/14/2024 | Conditional Approval | BRIAN SULLIVAN |
| Drywall Nailing | 5/31/2024 | Approved | RAUL BARAJAS |
| Footing/Foundation/Slab | 5/31/2024 | Approved | RAUL BARAJAS |
| Wood Frame | 5/31/2024 | Corrections Issued | RAUL BARAJAS |
| Deputy Steel/Welding | 6/20/2024 | Conditional Approval | RAUL BARAJAS |
| Wood Frame | 6/20/2024 | Corrections Issued | RAUL BARAJAS |
| Final | 5/22/2025 | Not Ready for Inspection | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 5/22/2025 | SGSOV Not Ready | ROY SPAULDING |
| Smoke Detectors | 5/22/2025 | No Access for Inspection | ROY SPAULDING |
| Final | 5/28/2025 | Corrections Issued | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 5/28/2025 | SGSOV Approved | ROY SPAULDING |
| Smoke Detectors | 5/28/2025 | Approved | ROY SPAULDING |
| Final | 7/23/2025 | Not Ready for Inspection | ROY SPAULDING |
| Final | 8/11/2025 | Not Ready for Inspection | ROY SPAULDING |
| Final | 8/22/2025 | Corrections Issued | ROY SPAULDING |
| Final | 8/27/2025 | Permit Finaled | ROY SPAULDING |