5108 E ALMADEN DR 5108 90042

Certificate Information: 5108 E ALMADEN DR 5108 90042

Application / Permit
23016-10000-36266
Plan Check / Job No.
B23LA19449
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
FIRE DAMAE REPAIR PLAN (LIKE FOR LIKE)(NO STRUCTURAL DAMAGE) 1. REPLACE ENTIRE WOOD SIDING W/ SHEAR WALL. 2. REPLACE FIRE DAMAGED (E) WINDOWS WITH SAME SIZE AND VINYL FRAME. 3. REPLACE (E) ENTIRE FIRE SMOKE DAMAGED DRYWALL.
Permit Issued
Issued on 11/14/2023
Issuing Office
Current Status
Permit Finaled on 9/27/2024

Permit Application Status History

Submitted 10/18/2023 APPLICANT
Assigned to Plan Check Engineer 10/19/2023 KHUONG TRUONG
Corrections Issued 10/19/2023 KHUONG TRUONG
Plan Check Approved 11/8/2023 KHUONG TRUONG
Issued 11/14/2023 APPLICANT
Permit Finaled 9/26/2024 ALIZAH MAYAGOITIA

Permit Application Clearance Information

Tenant Habitability Plan Cleared 11/2/2023 RICARDO BOHORQUEZ

Contact Information

Contractor Paglia & Associates Construction Inc; Lic. No.: 485114-B       ,
Contractor Pro Tech Construction Restoration & 1800 Boardup; Lic. No.: 485114-B       ,
Engineer Choi,, Jong; Lic. No.: NA40597       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 11/22/2023 Conditional Approval ROY SPAULDING
Wood Frame 12/4/2023 Corrections Issued RICHARD DOCKUS
Wood Frame 12/7/2023 Corrections Issued ROY SPAULDING
ELECTRICAL-Rough 12/15/2023 Not Ready for Inspection ROY SPAULDING
Floor/Roof Diaphrgm/Shear Wall 12/15/2023 Not Ready for Inspection ROY SPAULDING
HVAC-Rough 12/15/2023 Corrections Issued ROY SPAULDING
PLUMBING-Rough 12/15/2023 Approved ROY SPAULDING
Interior/Exterior Lathing 12/20/2023 Approved ROY SPAULDING
ELECTRICAL-Rough 1/5/2024 Partial Approval ROY SPAULDING
Gas Test 1/5/2024 Approved ROY SPAULDING
Interior/Exterior Lathing 1/5/2024 Approved ROY SPAULDING
PLUMBING-Rough 1/5/2024 Approved ROY SPAULDING
HVAC-Rough 1/17/2024 Corrections Issued ROY SPAULDING
Wood Frame 1/17/2024 Not Ready for Inspection ROY SPAULDING
HVAC-Rough 1/22/2024 Approved ROY SPAULDING
Wood Frame 1/22/2024 Approved ROY SPAULDING
Insulation 2/2/2024 Approved ALIZAH MAYAGOITIA
Drywall Nailing 2/20/2024 Approved ALIZAH MAYAGOITIA
Grounding or Bonding 3/4/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
Underground Mechanical 3/4/2024 Approved ALIZAH MAYAGOITIA
Service/Power Release 5/8/2024 Corrections Issued ALIZAH MAYAGOITIA
Final 9/26/2024 Permit Finaled ALIZAH MAYAGOITIA
SGSOV-Seismic Gas S/O Valve 9/26/2024 SGSOV Approved ALIZAH MAYAGOITIA
Smoke Detectors 9/26/2024 Approved ALIZAH MAYAGOITIA