822 E 77TH ST 90001
Certificate Information: 822 E 77TH ST 90001
- Application / Permit
- 23016-10000-34534
- Plan Check / Job No.
- X23LA09832
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (9) Window and (13) door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24. (1) Kitchen / (2) Bathroom remodel for residential buildings (no structural changes). MEP's included. Re-stucco for residential buildings. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___14___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b) 2B. Replace drywall (no new walls added) for single family dwellings and duplexes only.
- Permit Issued
- Issued on 10/5/2023
- Issuing Office
- South Los Angeles
- Current Status
- Permit Finaled on 2/27/2024
Permit Application Status History
| Issued | 10/5/2023 | APPLICANT |
| Permit Finaled | 2/27/2024 | DANIEL GUEVARA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Altera Construction; Lic. No.: 1036431-B | 211 W 92ND STREET LOS ANGELES, CA 90003 |
Inspector Information
| JEREMY TODD, (213) 978-4495 | Office Hours: 7:00-8:00 AM MON-FRI |
| MARVIN FONSECA, (213) 978-4495 | Office Hours: 7:00-8:00 AM MON-FRI |
| DANIEL GUEVARA, (213) 978-4495 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Pre-Inspection | 10/6/2023 | Approved | DANIEL GUEVARA |
| ELECTRICAL-Rough | 10/10/2023 | Approved | DANIEL GUEVARA |
| HVAC-Rough | 10/20/2023 | Partial Inspection | DANIEL GUEVARA |
| PLUMBING-Rough | 10/20/2023 | Partial Inspection | DANIEL GUEVARA |
| HVAC-Rough | 10/25/2023 | Approved | DANIEL GUEVARA |
| PLUMBING-Rough | 10/25/2023 | Approved | DANIEL GUEVARA |
| Floor/Roof Diaphrgm/Shear Wall | 1/4/2024 | Approved | DANIEL GUEVARA |
| Insulation | 2/20/2024 | No Access for Inspection | DANIEL GUEVARA |
| Interior/Exterior Lathing | 2/20/2024 | No Access for Inspection | DANIEL GUEVARA |
| Drywall Nailing | 2/22/2024 | Approved | DANIEL GUEVARA |
| ELECTRICAL-Final | 2/22/2024 | Corrections Issued | DANIEL GUEVARA |
| HVAC-Final | 2/22/2024 | Approved | DANIEL GUEVARA |
| PLUMBING-Final | 2/22/2024 | Corrections Issued | DANIEL GUEVARA |
| ELECTRICAL-Final | 2/27/2024 | Approved | DANIEL GUEVARA |
| Final | 2/27/2024 | Permit Finaled | DANIEL GUEVARA |
| Green Building Final | 2/27/2024 | Not Ready for Inspection | DANIEL GUEVARA |
| PLUMBING-Final | 2/27/2024 | Approved | DANIEL GUEVARA |
| SGSOV-Seismic Gas S/O Valve | 2/27/2024 | SGSOV Approved | DANIEL GUEVARA |
| Service/Power Release | 2/27/2024 | Approved | DANIEL GUEVARA |
| Smoke Detectors | 2/27/2024 | Approved | DANIEL GUEVARA |