417 E 5TH ST 90013

Certificate Information: 417 E 5TH ST 90013

Application / Permit
23016-10000-33917
Plan Check / Job No.
B23LA18425
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(11) Hotel
Work Description
NON-STRUCTURAL REMODEL OF USE (E) 3-STORY RESIDENTIAL BUILDING. 60 EXTREMELY LOW INCOME UNITS AND ONE MANAGERS UNIT MAINTENANCE WORK AND MISCELLANEOUS REPAIRS FOR AN AFFORDABLE HOUSING PROJECT CLASSIFIED AS A NON-TRANSIENT SRO HOTEL. THE SCOPE OF WORK INCLUDES NON-STRUCTURAL MAINTENANCE AND REPAIR OF THE FOLLOWING ITEMS: REPLACEMENT IN KIND OF ALL WINDOWS AND COVERINGS (VERTICAL BLIND) THROUGHOUT THE BUILDING. REPLACEMENT IN KIND OF ALL DOORS AS NOTED IN PLANS. REPLACEMENT IN KIND OF FLOORING THROUGHOUT THE BUILDING. REMOVAL OF (E) ALL PLUMING FIXTURES; REPLACEMENT IN KIND AS NOTED IN PLANS. REPLACEMENT IN KIND OF (E) ELECTRICAL FIXTURES. REPLACEMENT OF ROOF WITH A CLASS 'A' ROOFING TPO MATERIAL PATCH AND REPAIR EXISTING INTERIOR WALLS AND CEILINGS. ACCESSIBILITY GUESTROOM UPGRADES TO INCLUDE: 11% (7) MOBILITY GUESTROOMS AND 5% (4) COMMUNICATION (AUDIO/VISUAL) GUESTROOMS AND COMMON AREA ACCESSIBILITY UPGRADES.
Permit Issued
Issued on 4/24/2024
Issuing Office
Current Status
Permit Finaled on 3/5/2026

Permit Application Status History

Submitted 10/16/2023 APPLICANT
Assigned to Plan Check Engineer 10/19/2023 MANUEL MONTUFAR
Corrections Issued 10/26/2023 MANUEL MONTUFAR
Quality Review Completed 10/31/2023 KEVIN MORALES
Applicant returned to address corrections 1/25/2024 MANUEL MONTUFAR
Applicant returned to address corrections 2/28/2024 MANUEL MONTUFAR
Plan Check Approved 4/12/2024 MANUEL MONTUFAR
Issued 4/24/2024 APPLICANT
Permit Finaled 3/5/2026 PAUL BAZERKANIAN

Permit Application Clearance Information

"D" conditions Cleared 11/7/2023 BRENNEN OBETO
"Q" conditions Cleared 11/7/2023 BRENNEN OBETO
CPC Cleared 11/7/2023 BRENNEN OBETO
CPC Cleared 11/7/2023 BRENNEN OBETO
Green Code Cleared 12/1/2023 AARON COSTA
Green Code Cleared 12/1/2023 AARON COSTA
DAS Clearance Cleared 12/11/2023 ELIZABETH TOMS
DAS Clearance Cleared 12/11/2023 ELIZABETH TOMS
Historic Resource Verification Cleared 12/12/2023 RAFAEL FONTES
Fire Marshal Fire Life Safety Cleared 12/15/2023 MENOA AGHAJANI
RDP Residential Hotel/SRO Cleared 3/13/2024 ISMAEL HERNANDEZ
Tenant Habitability Plan Cleared 3/13/2024 ISMAEL HERNANDEZ
Demo/Removal of Rental Units Cleared 3/14/2024 EDWARD JACOBS
Residential hotels Cleared 3/18/2024 MARITES CUNANAN
DCP conditions approval Cleared 4/12/2024 MARITES CUNANAN
Miscellaneous Cleared 4/12/2024 JASON CHAN
Redevelopment Project Area Cleared 4/12/2024 ELIZABETH GALLARDO
Residential Hotel/SRO Cleared 4/12/2024 ELIZABETH GALLARDO
ZI Cleared 4/12/2024 ELIZABETH GALLARDO

Contact Information

Architect Egan,, John S; Lic. No.: NA28572       ,
Contractor Westport Construction Inc; Lic. No.: 712732-B 125 W MAPLE AVE      MONROVIA, CA 91016
Engineer Labib,, Youhanna T.; Lic. No.: S4549 319 MAIN STREET      EL SEGUNDO, CA 90245

Inspector Information

JEROME BLACKWOOD, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI
REGINA MENDEZ, (213) 213-5353 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 7/19/2024 Not Ready for Inspection LUIS CCAMACHO
Wood Frame 9/19/2024 Partial Approval PAUL BAZERKANIAN
Insulation 4/3/2025 Partial Approval PAUL BAZERKANIAN
Light Gage Steel Frame 4/21/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 4/24/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 5/9/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 5/30/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 6/16/2025 Not Ready for Inspection JEROME BLACKWOOD
Drywall Nailing 6/18/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 7/3/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 8/6/2025 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 8/13/2025 Partial Approval LUIS CCAMACHO
Drywall Nailing 8/15/2025 Approved RONALD JIMENEZ
Drywall Nailing 8/20/2025 Not Ready for Inspection PAUL BAZERKANIAN
Final 9/29/2025 Not Ready for Inspection PAUL BAZERKANIAN
Green Building Final 9/29/2025 Not Ready for Inspection PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 9/29/2025 SGSOV Not Ready PAUL BAZERKANIAN
Smoke Detectors 9/29/2025 Not Ready for Inspection PAUL BAZERKANIAN
Final 10/1/2025 Not Ready for Inspection PAUL BAZERKANIAN
Green Building Final 10/1/2025 Not Ready for Inspection PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 10/1/2025 SGSOV Not Ready PAUL BAZERKANIAN
Smoke Detectors 10/1/2025 Not Ready for Inspection PAUL BAZERKANIAN
Notice of Violation 1/23/2026 Not Required PAUL BAZERKANIAN
Final 3/5/2026 Permit Finaled PAUL BAZERKANIAN
Green Building Final 3/5/2026 Approved PAUL BAZERKANIAN
SGSOV-Seismic Gas S/O Valve 3/5/2026 SGSOV Approved PAUL BAZERKANIAN
Smoke Detectors 3/5/2026 Approved PAUL BAZERKANIAN