4688 E CLELAND AVE 90065

Certificate Information: 4688 E CLELAND AVE 90065

Application / Permit
23016-10000-30195
Plan Check / Job No.
B23LA16556
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
ALTER REPAIR TO (E) SFD WITH ATTACHED GARAGE TO REPLACE (E) FIRE DAMAGED GARAGE. SCOPE OF WORK TO INCLUDE INTERIOR REMODEL OF HOUSE AND WINDOW CHANGE OUT.
Permit Issued
Issued on 11/2/2023
Issuing Office
Metro
Current Status
Permit Finaled on 12/24/2024

Permit Application Status History

Submitted 9/6/2023 APPLICANT
Assigned to Plan Check Engineer 9/11/2023 NEHEMIAS RAMOS
Corrections Issued 9/12/2023 NEHEMIAS RAMOS
Building Plans Picked Up 9/25/2023 APPLICANT
Applicant returned to address corrections 10/18/2023 ZAW HAN
Plan Check Approved 11/2/2023 VICTOR CHEN
Issued 11/2/2023 APPLICANT
Permit Finaled 12/24/2024 ALIZAH MAYAGOITIA

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 9/21/2023 NEIL TUANO
Eng Process Fee Ord 176,300 Cleared 9/26/2023 NEIL TUANO
Grading Pre-Inspection Cleared 10/25/2023 SERGIO VALENZUELA
Specific Plan Cleared 10/31/2023 ANDREA MAGANA-WITHERS

Contact Information

Contractor Owner-Builder       ,
Engineer Ghanim,, Husam; Lic. No.: S5689 1594 CASITAS AVENUE      PASADENA, CA 91103

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 1/16/2024 Partial Inspection OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 3/22/2024 Conditional Approval ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 4/17/2024 Approved ALIZAH MAYAGOITIA
ELECTRICAL-Rough 5/31/2024 Approved OSVALDO PARAMO
HVAC-Rough 5/31/2024 Approved OSVALDO PARAMO
Interior/Exterior Lathing 5/31/2024 Not Ready for Inspection OSVALDO PARAMO
Wood Frame 5/31/2024 Approved OSVALDO PARAMO
Interior/Exterior Lathing 6/24/2024 Approved OSVALDO PARAMO
Insulation 7/16/2024 Approved ALIZAH MAYAGOITIA
Drywall Nailing 7/29/2024 Approved OSVALDO PARAMO
Interior/Exterior Lathing 8/22/2024 Approved LUIS CASTRO
BUILDING-Rough-Frame 12/19/2024 Approved BRENDAN MORELLI
Final 12/19/2024 Corrections Issued BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 12/19/2024 SGSOV Approved BRENDAN MORELLI
Smoke Detectors 12/19/2024 Approved BRENDAN MORELLI
Pre-Inspection 12/23/2024 Not Ready for Inspection THOMAS LOGRASSO
Final 12/24/2024 Permit Finaled ALIZAH MAYAGOITIA