3140 N STOCKBRIDGE AVE 90032

Certificate Information: 3140 N STOCKBRIDGE AVE 90032

Application / Permit
23016-10000-27062
Plan Check / Job No.
B23LA15056
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
EPLAN: CONVERSION OF EXISTING DETACHED 2-CAR GARAGE WITH NEW ADDITION INTOA DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d)
Permit Issued
Issued on 1/24/2024
Issuing Office
Current Status
CofO Issued on 10/1/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/14/2023 APPLICANT
Assigned to Plan Check Engineer 8/17/2023 LUISANGEL VALENZUELA
Corrections Issued 8/17/2023 LUISANGEL VALENZUELA
Applicant returned to address corrections 10/4/2023 KEVIN MORALES
Plan Check Approved 12/13/2023 KEVIN MORALES
Issued 1/24/2024 APPLICANT
CofO in Progress 9/26/2024 BRENDAN MORELLI
Permit Finaled 10/1/2024 RUBEN SALAS
CofO Issued 10/1/2024 RUBEN SALAS
Permit Finaled 10/1/2024 RUBEN SALAS

Permit Application Clearance Information

Address approval Cleared 8/28/2023 AMBER CAMPBELL
Roof/Waste drainage to street Cleared 8/28/2023 AMBER CAMPBELL
Eng Process Fee Ord 176,300 Cleared 8/31/2023 AMBER CAMPBELL
Sewer availability Cleared 8/31/2023 AMBER CAMPBELL
Grading Pre-Inspection Cleared 10/19/2023 RUSSELL BONVOULOIR
Construction near power lines Cleared 12/10/2023 RIDWAN HARDY

Contact Information

Contractor Dotz Inc; Lic. No.: 1033830-B       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 1/30/2024 Partial Approval CRAIG VAUGHAN
Sewer 1/30/2024 Approved CRAIG VAUGHAN
Footing/Foundation/Slab 2/15/2024 Corrections Issued LILIANA PORTILLO
Footing/Foundation/Slab 3/26/2024 Partial Approval LILIANA PORTILLO
Footing/Foundation/Slab 4/1/2024 Approved JOSEPH MCGARRY
ELECTRICAL-Rough 4/25/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 4/25/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 5/3/2024 Conditional Approval LILIANA PORTILLO
ELECTRICAL-Rough 5/3/2024 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 5/3/2024 Approved LILIANA PORTILLO
Gas Test 5/3/2024 Approved LILIANA PORTILLO
HVAC-Rough 5/3/2024 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 5/3/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 5/14/2024 Approved BRENDAN MORELLI
HVAC-Rough 5/14/2024 Approved BRENDAN MORELLI
Interior/Exterior Lathing 5/14/2024 Partial Approval BRENDAN MORELLI
Insulation 5/30/2024 Corrections Issued LILIANA PORTILLO
Drywall Nailing 6/11/2024 Approved LILIANA PORTILLO
Insulation 6/11/2024 Approved LILIANA PORTILLO
Interior/Exterior Lathing 6/28/2024 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 9/6/2024 SGSOV Not Ready BRENDAN MORELLI
Final 9/19/2024 Corrections Issued BRENDAN MORELLI
SGSOV-Seismic Gas S/O Valve 9/19/2024 SGSOV Approved BRENDAN MORELLI
Smoke Detectors 9/19/2024 Approved BRENDAN MORELLI
Final 9/24/2024 OK to Issue CofO BRENDAN MORELLI
Service/Power Release 9/24/2024 Approved BRENDAN MORELLI