2023 1/2 N GATES ST 90031

Certificate Information: 2023 1/2 N GATES ST 90031

Application / Permit
23016-10000-27008
Plan Check / Job No.
B23LA15020
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL OF EXISTING SINGLE FAMILY DWELLING. STRUCTURAL UPGRADES
Permit Issued
Issued on 9/14/2023
Issuing Office
Current Status
Permit Finaled on 2/15/2024

Permit Application Status History

Submitted 8/14/2023 APPLICANT
Assigned to Plan Check Engineer 8/16/2023 JOE VO
Corrections Issued 8/16/2023 JOE VO
Plan Check Approved 9/14/2023 JOE VO
Issued 9/14/2023 APPLICANT
Permit Finaled 2/14/2024 OSVALDO PARAMO

Permit Application Clearance Information

Tenant Habitability Plan Cleared 9/12/2023 RICARDO BOHORQUEZ

Contact Information

Contractor Yakov Design & Build; Lic. No.: 1067993-B       ,
Engineer Sivushenka,, Mikita; Lic. No.: C87698 22814 DOLOROSA ST      WOODLAND HILLS, CA 91367

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

ELECTRICAL-Rough 11/14/2023 Approved ALIZAH MAYAGOITIA
Footing/Foundation/Slab 11/14/2023 Approved ALIZAH MAYAGOITIA
HVAC-Rough 11/14/2023 Partial Approval ALIZAH MAYAGOITIA
Interior/Exterior Lathing 11/14/2023 Not Ready for Inspection ALIZAH MAYAGOITIA
PLUMBING-Rough 11/14/2023 Approved ALIZAH MAYAGOITIA
Deputy Drilled-In Anchors 11/29/2023 Conditional Approval OSVALDO PARAMO
HVAC-Rough 11/29/2023 Approved OSVALDO PARAMO
Interior/Exterior Lathing 11/29/2023 Partial Approval OSVALDO PARAMO
Shower Pan 11/29/2023 Approved OSVALDO PARAMO
Wood Frame 11/29/2023 Approved OSVALDO PARAMO
BUILDING-Rough-Frame 12/7/2023 Approved OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 12/7/2023 Approved OSVALDO PARAMO
Insulation 12/7/2023 Approved OSVALDO PARAMO
Interior/Exterior Lathing 12/7/2023 Approved OSVALDO PARAMO
Drywall Nailing 12/15/2023 Approved ALIZAH MAYAGOITIA
Final 2/3/2024 Corrections Issued LILIANA PORTILLO
Gas Test 2/3/2024 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 2/3/2024 SGSOV Not Ready LILIANA PORTILLO
Service/Power Release 2/3/2024 Not Required LILIANA PORTILLO
Smoke Detectors 2/3/2024 Approved LILIANA PORTILLO
Final 2/8/2024 Corrections Issued OSVALDO PARAMO
Gas Test 2/8/2024 Approved OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 2/8/2024 SGSOV Approved OSVALDO PARAMO
Final 2/14/2024 Permit Finaled OSVALDO PARAMO