4252 N GREENBUSH AVE 91423

Certificate Information: 4252 N GREENBUSH AVE 91423

Application / Permit
23016-10000-25441
Plan Check / Job No.
B23LA13460
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Existing residence renovation including "" new roof "", new HVAC, all new windows and doors, new exterior cement plaster, kitchen and bath remodel and bedroom closet reconfiguration. 2 of 2
Permit Issued
Issued on 8/1/2024
Issuing Office
Current Status
Permit Finaled on 2/11/2026

Permit Application Status History

Submitted 7/21/2023 APPLICANT
Assigned to Plan Check Engineer 7/27/2023 TSE MING HUANG
Corrections Issued 8/1/2023 TSE MING HUANG
Quality Review Completed 8/4/2023 KEVIN MORALES
Applicant returned to address corrections 5/16/2024 TSE MING HUANG
Applicant returned to address corrections 5/20/2024 TSE MING HUANG
Plan Check Approved 7/15/2024 TSE MING HUANG
Issued 8/1/2024 APPLICANT
Permit Finaled 2/10/2026 MISAEL ESPARZA

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/14/2023 CARLOS AGUILERA
Low Impact Development (LID) Cleared 3/1/2024 LUIS CRUZ
Roof/Waste drainage to street Cleared 4/4/2024 CARLOS AGUILERA

Contact Information

Architect Johnstone,, Darin Robert; Lic. No.: C29689 7462 NORTH FIGUEROA # 206      LOS ANGELES, CA 90041
Contractor Srk Construction Inc; Lic. No.: 1040488-B       ,

Inspector Information

MISAEL ESPARZA, (818) 374-1169 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Steel/Welding 10/16/2024 Conditional Approval JUAN VALENZUELA
Deputy Drilled-In Anchors 11/15/2024 Conditional Approval JUAN VALENZUELA
ELECTRICAL-Rough 2/6/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Rough 2/6/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
PLUMBING-Rough 2/6/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Wood Frame 2/6/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
HVAC-Rough 2/11/2025 Not Ready for Inspection MISAEL ESPARZA
Wood Frame 2/11/2025 Corrections Issued MISAEL ESPARZA
Drywall Nailing 2/19/2025 Approved MICHAEL CORTEZ
ELECTRICAL-Rough 3/12/2025 Approved MISAEL ESPARZA
HVAC-Rough 3/12/2025 Approved MISAEL ESPARZA
PLUMBING-Rough 3/12/2025 Approved MISAEL ESPARZA
Wood Frame 3/18/2025 Approved MISAEL ESPARZA
Final 3/20/2025 Not Ready for Inspection MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 3/20/2025 SGSOV Not Ready MISAEL ESPARZA
Smoke Detectors 3/20/2025 Not Ready for Inspection MISAEL ESPARZA
Interior/Exterior Lathing 4/9/2025 Partial Approval MISAEL ESPARZA
Final 2/2/2026 Corrections Issued MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 2/2/2026 SGSOV Not Ready MISAEL ESPARZA
Smoke Detectors 2/2/2026 Corrections Issued MISAEL ESPARZA
Final 2/10/2026 Permit Finaled MISAEL ESPARZA
SGSOV-Seismic Gas S/O Valve 2/10/2026 SGSOV Approved MISAEL ESPARZA
Smoke Detectors 2/10/2026 Approved MISAEL ESPARZA