1432 W CARROLL AVE 90026

Certificate Information: 1432 W CARROLL AVE 90026

Application / Permit
23016-10000-22349
Plan Check / Job No.
B23LA12520
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL (E) 2-STORY SFD, INCLUDING BATHROOMS AND KITCHEN REMODEL, WINDOW TO DOOR CONVERSION, 23 WINDOW CHANGES SAME SIZE AND LOCATION, NEW OPEN DECK AT REAR
Permit Issued
Issued on 11/3/2023
Issuing Office
Metro
Current Status
Permit Finaled on 3/6/2025

Permit Application Status History

Submitted 7/7/2023 APPLICANT
Assigned to Plan Check Engineer 7/10/2023 DANIEL SANJUAN
Corrections Issued 7/12/2023 DANIEL SANJUAN
Building Plans Picked Up 7/14/2023 APPLICANT
Applicant returned to address corrections 9/1/2023 MINA HABILI
Issued 11/3/2023 APPLICANT
Permit Finaled 3/5/2025 HAMIK HARTOUNIAN

Permit Application Clearance Information

CPC Cleared 8/14/2023 RYAN LY
Eng Process Fee Ord 176,300 Cleared 8/14/2023 STEVE MELGAR
Roof/Waste drainage to street Cleared 8/14/2023 STEVE MELGAR
Grading Pre-Inspection Cleared 9/1/2023 DANIEL SANJUAN
HPOZ Cleared 10/25/2023 SUKI GERSHENHORN

Contact Information

Contractor Owner-Builder       ,
Engineer Shahbaz,, Shant Pierre; Lic. No.: C93079 15445 VENTURA BLVD #63      SHERMAN OAKS, CA 91403

Inspector Information

HAMIK HARTOUNIAN, (213) 202-3275 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 2/9/2024 Not Ready for Inspection THOMAS LOGRASSO
Deputy Wood Construction 2/9/2024 Conditional Approval THOMAS LOGRASSO
HVAC-Rough 2/9/2024 Corrections Issued THOMAS LOGRASSO
MERV13>=Rough 2/9/2024 Approved THOMAS LOGRASSO
PLUMBING-Rough 2/9/2024 Corrections Issued THOMAS LOGRASSO
Floor/Roof Diaphrgm/Shear Wall 2/13/2024 Corrections Issued FREDDIE RIVERA
Footing/Foundation/Slab 2/13/2024 Approved FREDDIE RIVERA
PLUMBING-Rough 2/13/2024 Approved FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 2/14/2024 Approved FREDDIE RIVERA
HVAC-Rough 2/16/2024 Not Ready for Inspection THOMAS LOGRASSO
Wood Frame 2/16/2024 Partial Approval THOMAS LOGRASSO
Drywall Nailing 2/28/2024 Approved THOMAS LOGRASSO
BUILDING-Rough-Frame 3/6/2024 Approved THOMAS LOGRASSO
Pre-Inspection 4/10/2024 Approved THOMAS LOGRASSO
Shower Pan 4/24/2024 Approved ARTHUR NEGRETE
HVAC-Rough 6/7/2024 Approved BRENDAN MORELLI
Interior/Exterior Lathing 7/12/2024 Partial Approval HAMIK HARTOUNIAN
Final 2/20/2025 Corrections Issued HAMIK HARTOUNIAN
MERV13>=Final 2/20/2025 Approved HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 2/20/2025 SGSOV Not Ready HAMIK HARTOUNIAN
Smoke Detectors 2/20/2025 Approved HAMIK HARTOUNIAN
Final 3/5/2025 Permit Finaled HAMIK HARTOUNIAN
SGSOV-Seismic Gas S/O Valve 3/5/2025 SGSOV No Gas HAMIK HARTOUNIAN