3408 N DIVISION ST 90065

Certificate Information: 3408 N DIVISION ST 90065

Application / Permit
23016-10000-21111
Plan Check / Job No.
B23LA11848
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
INTERIOR AND EXTERIOR REMODEl. NEW BATHROOM IN EXISTING BEDROOM. REMODEL KITCHEN AND (E) BATHROOM. NEW BEAM BETWEEN KITCHEN AND DINING. RE-FRAME FRONTWALL DUE TO TERMITE. NEW PAD AND FLUSH BEAM. REPLACE WINDOWS WITH LIKE FOR LIKE. ADD NEW PLYWOOD TO EXTERIOR WALLS. REFRAME REAR WINDOWS WITH NEW HEADERS. RE-ROOF AND RE-STUCCO.
Permit Issued
Issued on 8/4/2023
Issuing Office
Current Status
Permit Finaled on 3/28/2024

Permit Application Status History

Submitted 6/27/2023 APPLICANT
Assigned to Plan Check Engineer 6/27/2023 WEIJIAN HUANG
Corrections Issued 6/27/2023 WEIJIAN HUANG
Issued 8/4/2023 APPLICANT
Permit Finaled 3/27/2024 OSVALDO PARAMO

Permit Application Clearance Information

Specific Plan Cleared 7/6/2023 GEORGIA SMITH
Grading Pre-Inspection Cleared 7/17/2023 SERGIO VALENZUELA

Contact Information

Contractor Owner-Builder       ,
Engineer Madero,, Fidencio; Lic. No.: C81695 10002 PANGBORN AVE      DOWNEY, CA 90240

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 8/31/2023 Corrections Issued OSVALDO PARAMO
ELECTRICAL-Rough 8/31/2023 Corrections Issued OSVALDO PARAMO
Floor/Roof Diaphrgm/Shear Wall 8/31/2023 Partial Inspection OSVALDO PARAMO
HVAC-Rough 8/31/2023 Corrections Issued OSVALDO PARAMO
Footing/Foundation/Slab 10/20/2023 Approved OSVALDO PARAMO
ELECTRICAL-Rough 11/6/2023 Corrections Issued ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 11/6/2023 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 11/6/2023 Approved ALIZAH MAYAGOITIA
ELECTRICAL-Rough 11/13/2023 Approved OSVALDO PARAMO
HVAC-Rough 11/13/2023 Corrections Issued OSVALDO PARAMO
BUILDING-Rough-Frame 11/17/2023 Approved BRIAN SULLIVAN
HVAC-Rough 11/17/2023 Approved BRIAN SULLIVAN
Insulation 11/28/2023 Approved ALIZAH MAYAGOITIA
Drywall Nailing 12/5/2023 Conditional Approval HAMIK HARTOUNIAN
Interior/Exterior Lathing 12/5/2023 Approved HAMIK HARTOUNIAN
Final 3/14/2024 Corrections Issued OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 3/14/2024 SGSOV Not Ready OSVALDO PARAMO
Smoke Detectors 3/14/2024 Approved OSVALDO PARAMO
Final 3/20/2024 Conditional Approval OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 3/20/2024 SGSOV Approved OSVALDO PARAMO
Final 3/27/2024 Permit Finaled OSVALDO PARAMO
Service/Power Release 3/27/2024 Approved OSVALDO PARAMO