728 S WESTHOLME AVE 90024

Certificate Information: 728 S WESTHOLME AVE 90024

Application / Permit
23016-10000-20664
Plan Check / Job No.
B23LA11551
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Addtion and Remodel of (E) Approved Plan ( #22014-10000-04945), REVISIONS TO CONSIST OF THE FOLLOWING: >REMODEL (E) KITCHEN INCLUDING CABINETS, TILING, FLOORING, APPLIANCS, PLUMING AND ELECTRICAL. >1ST FLOOR INTERIOR REMODEL TO CREATE LAUNDRY AND BATHROOM >ADD NEW BATHROOM TO THIRD FLOOR PER PLAN PROVIDED >RECONFIGURE PORTION OF (E) STAIRCASE AS WELL AS REDESIGN OF NEW STAIRCASE ELADING TO THIRD FLOOR PER PLAN PROVIDED >TRUCTURAL PLANS UPDATED TO CURRENT LAYOUT TO MATCH >Addition on 3rd floor (118.5 S.F.) and deck (75 S.F.).
Permit Issued
Issued on 8/7/2023
Issuing Office
Metro
Current Status
Issued on 8/7/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 6/22/2023 APPLICANT
Assigned to Plan Check Engineer 6/29/2023 TSE MING HUANG
Corrections Issued 7/3/2023 TSE MING HUANG
Quality Review Completed 7/5/2023 EUGENE BARBEAU
Building Plans Picked Up 7/7/2023 APPLICANT
Applicant returned to address corrections 7/21/2023 TSE MING HUANG
Plan Check Approved 8/2/2023 TSE MING HUANG
Issued 8/7/2023 APPLICANT

Permit Application Clearance Information

Specific Plan Cleared 7/24/2023 EDUARDO HERMOSO
Low Impact Development (LID) Cleared 7/25/2023 LUIS LUVANO
Eng Process Fee Ord 176,300 Cleared 7/31/2023 ANTHONY MAINEZ
Roof/Waste drainage to street Cleared 7/31/2023 ANTHONY MAINEZ

Contact Information

Contractor Pacific Coast Developers; Lic. No.: 888234-B 5249 BECKFORD AVENUE      TARZANA, CA 91356
Engineer Rhee,, Kyle; Lic. No.: C78215 2753 WAVERLY DR 403      LOS ANGELES, CA 90039

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 9/19/2023 Not Ready for Inspection CHRISTOPHER WILSON
Footing/Foundation/Slab 9/19/2023 Approved CHRISTOPHER WILSON
Deputy Wood Construction 9/26/2023 Conditional Approval STEPHANIE SWANSON
BUILDING-Rough-Frame 3/4/2024 Approved STEPHANIE SWANSON
ELECTRICAL-Final 3/4/2024 Corrections Issued STEPHANIE SWANSON
Final 3/4/2024 Not Ready for Inspection STEPHANIE SWANSON
HVAC-Final 3/4/2024 Conditional Approval STEPHANIE SWANSON
PLUMBING-Final 3/4/2024 Conditional Approval STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 3/4/2024 SGSOV Not Ready STEPHANIE SWANSON
Smoke Detectors 3/4/2024 Corrections Issued STEPHANIE SWANSON