813 E BROOKS AVE 90291

Certificate Information: 813 E BROOKS AVE 90291

Application / Permit
23016-10000-19042
Plan Check / Job No.
B23LA10690
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
EPLAN: FIRE DAMAGE REPAIR TO WALLS AND ROOF TO (E) BEDROOMS, KITCHEN, AND BATHROOM, AND REPLACE DRYWALLS AND ALL WINDOWS TO (E) S.F.D. PER ENGINEERING
Permit Issued
Issued on 9/7/2023
Issuing Office
Current Status
Permit Finaled on 3/26/2025

Permit Application Status History

Submitted 6/9/2023 APPLICANT
Assigned to Plan Check Engineer 6/14/2023 ALFRED RAMIREZ
Corrections Issued 6/15/2023 ALFRED RAMIREZ
Applicant returned to address corrections 8/31/2023 ALFRED RAMIREZ
Plan Check Approved 9/6/2023 ALFRED RAMIREZ
Issued 9/7/2023 APPLICANT
Permit Finaled 3/24/2025 JESUS RODRIGUEZ

Permit Application Clearance Information

Roof/Waste drainage to street Cleared 6/20/2023 ANTHONY MAINEZ
Eng Process Fee Ord 176,300 Cleared 6/21/2023 ANTHONY MAINEZ
Coastal Zone Cleared 8/24/2023 RUBEN VASQUEZ
Specific Plan Cleared 8/30/2023 LUIS LOPEZ
ZI Cleared 8/30/2023 LUIS LOPEZ

Contact Information

Contractor D & A Home Renovations; Lic. No.: 808672-B       ,
Engineer Choi,, Jong; Lic. No.: NA40597       ,

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 10/23/2023 Conditional Approval HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 6/12/2024 Corrections Issued HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 6/17/2024 Not Ready for Inspection HERBERT GIRON
Rough-Elec/Plmb/HVAC 6/17/2024 Not Ready for Inspection HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 6/21/2024 Corrections Issued HERBERT GIRON
Floor/Roof Diaphrgm/Shear Wall 6/28/2024 Corrections Issued HERBERT GIRON
HVAC-Rough 6/28/2024 Corrections Issued HERBERT GIRON
PLUMBING-Rough 6/28/2024 Corrections Issued HERBERT GIRON
Rough-Elec/Plmb/HVAC 7/5/2024 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 7/12/2024 Not Ready for Inspection HERBERT GIRON
Interior/Exterior Lathing 7/19/2024 Partial Approval HERBERT GIRON
BUILDING-Rough-Frame 7/23/2024 Corrections Issued JESUS RODRIGUEZ
BUILDING-Rough-Frame 7/29/2024 Approved HERBERT GIRON
Insulation 7/29/2024 Not Ready for Inspection HERBERT GIRON
Insulation 8/1/2024 Approved HERBERT GIRON
Drywall Nailing 8/9/2024 Approved HERBERT GIRON
Shower Pan 8/13/2024 Approved HERBERT GIRON
Interior/Exterior Lathing 8/22/2024 Approved HERBERT GIRON
ELECTRICAL-Final 1/30/2025 Corrections Issued HERBERT GIRON
ELECTRICAL-Final 2/11/2025 Corrections Issued HERBERT GIRON
Green Building Final 2/11/2025 Approved HERBERT GIRON
PLUMBING-Final 2/11/2025 Corrections Issued HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 3/4/2025 SGSOV Not Ready HERBERT GIRON
ELECTRICAL-Final 3/6/2025 Corrections Issued HERBERT GIRON
PLUMBING-Final 3/6/2025 Corrections Issued HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 3/6/2025 SGSOV Approved HERBERT GIRON
Smoke Detectors 3/6/2025 Corrections Issued HERBERT GIRON
Final 3/14/2025 Corrections Issued JESUS RODRIGUEZ
Smoke Detectors 3/14/2025 Corrections Issued JESUS RODRIGUEZ
ELECTRICAL-Final 3/24/2025 Approved JESUS RODRIGUEZ
Final 3/24/2025 Permit Finaled JESUS RODRIGUEZ
HVAC-Final 3/24/2025 Approved JESUS RODRIGUEZ
PLUMBING-Final 3/24/2025 Approved JESUS RODRIGUEZ
Smoke Detectors 3/24/2025 Approved JESUS RODRIGUEZ