1422 N TAMARIND AVE 90028

Certificate Information: 1422 N TAMARIND AVE 90028

Application / Permit
23016-10000-16165
Plan Check / Job No.
B23LA09272
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
Soft-Story Seismic Retrofit per LABC Chapter 93: Soft Story Retrofit for an existing apartment building; intall four (4) Special Steel Cantilever Columns. Verification of work done under separate ADU conversion from garage; permit number 23016-10000-13000; using wood shear wall and roof/ceiling assembly if meets minimum soft story ordinance requirement. Certificate of Compliance for soft story permit permit shall not be issued until ADU permit is obtained "Certificate of Occupancy."
Permit Issued
Issued on 2/1/2024
Issuing Office
Current Status
CofC Issued on 12/9/2025

Permit Application Status History

Submitted 5/20/2023 APPLICANT
Assigned to Plan Check Engineer 6/1/2023 BIDYUT RATH
Corrections Issued 6/12/2023 BIDYUT RATH
Quality Review Completed 6/23/2023 HANS SANTIAGO
Applicant returned to address corrections 9/5/2023 BIDYUT RATH
Applicant returned to address corrections 9/28/2023 BIDYUT RATH
Applicant returned to address corrections 10/20/2023 BIDYUT RATH
Plan Check Approved 10/23/2023 BIDYUT RATH
Issued 2/1/2024 APPLICANT
OK for CofC 12/9/2025 ERNESTO CORRAL
CofC Issued 12/9/2025 ERNESTO CORRAL

Permit Application Clearance Information

Historic Resource Verification Cleared 9/5/2023 MAX LODER
Redevelopment Project Area Cleared 10/17/2023 DAVID URITA
Tenant Habitability Plan Cleared 1/30/2024 RICARDO BOHORQUEZ

Contact Information

Contractor Stc Builders Inc; Lic. No.: 1101356-B       ,
Engineer Berkoz,, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Floor/Roof Diaphrgm/Shear Wall 3/29/2024 Approved JACOB MYERS
Footing/Foundation/Slab 3/29/2024 Approved JACOB MYERS
Structural Steel Frame 3/29/2024 Approved JACOB MYERS
Final 4/22/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 4/22/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 4/22/2025 Corrections Issued DARRYL ARNOLD
Deputy Drilled-In Anchors 5/14/2025 Conditional Approval DARRYL ARNOLD
Final 5/20/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 5/20/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 5/20/2025 Not Ready for Inspection DARRYL ARNOLD
Deputy Drilled-In Anchors 6/18/2025 Conditional Approval DARRYL ARNOLD
Deputy Wood Construction 6/18/2025 Conditional Approval DARRYL ARNOLD
Final 8/12/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 8/12/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 8/12/2025 Not Ready for Inspection DARRYL ARNOLD
Final 9/11/2025 Not Ready for Inspection LUIS CCAMACHO
SGSOV-Seismic Gas S/O Valve 9/11/2025 SGSOV Not Ready LUIS CCAMACHO
Smoke Detectors 9/11/2025 Not Ready for Inspection LUIS CCAMACHO
Final 10/2/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 10/2/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 10/2/2025 No Access for Inspection DARRYL ARNOLD
Final 11/7/2025 Not Ready for Inspection DARRYL ARNOLD
SGSOV-Seismic Gas S/O Valve 11/7/2025 SGSOV Not Ready DARRYL ARNOLD
Smoke Detectors 11/7/2025 Conditional Approval DARRYL ARNOLD
Final 12/9/2025 OK for CofC ERNESTO CORRAL
SGSOV-Seismic Gas S/O Valve 12/9/2025 SGSOV Approved ERNESTO CORRAL
Smoke Detectors 12/9/2025 Approved ERNESTO CORRAL