444 N BONHILL ROAD 90049
Certificate Information: 444 N BONHILL ROAD 90049
- Application / Permit
- 23016-10000-15925
- Plan Check / Job No.
- B23LA09133
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- ePlan INTERIOR REMODEL THAT INCLUDES CONVERTING BREAKFAST AREA INTO (N) BEDROOM AND BATH, RELOCATING KITCHEN, CONVERTING (E) BATHROOM INTO (N) POWDER ROOM AND LAUNDRY ROOM, REPLACING WINDOWS/GLASS DOORS THROUGHOUT, AND REMOVING TWO LOAD BEARING WALLS IN KITCHEN/LIVING AREAS. WORK PER ENGINEER.
- Permit Issued
- Issued on 6/14/2023
- Issuing Office
- Current Status
- Permit Finaled on 9/27/2024
Permit Application Status History
| Submitted | 5/17/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 5/19/2023 | ISIS ARGUETA |
| Corrections Issued | 5/20/2023 | ISIS ARGUETA |
| Plan Check Approved | 6/13/2023 | ISIS ARGUETA |
| Issued | 6/14/2023 | APPLICANT |
| Permit Finaled | 9/27/2024 | ARAM AVEDISIAN |
Permit Application Clearance Information
| Sewer availability | Cleared | 6/1/2023 | LIAM ODONOVAN |
| Eng Process Fee Ord 176,300 | Cleared | 6/5/2023 | LIAM ODONOVAN |
| Grading Pre-Inspection | Cleared | 6/9/2023 | SERGIO VALENZUELA |
Contact Information
| Contractor | Concept Renovations Inc; Lic. No.: 1016942-B | , |
| Engineer | Melchor,, Oscar Elias; Lic. No.: C76828 | 21243 VENTURA BLVD SUITE 119 WOODLAND HILLS, CA 91364 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 11/16/2023 | Corrections Issued | KEVIN SARGSYAN |
| ELECTRICAL-Rough | 11/16/2023 | Approved | KEVIN SARGSYAN |
| HVAC-Rough | 11/16/2023 | Approved | KEVIN SARGSYAN |
| PLUMBING-Rough | 11/16/2023 | Approved | KEVIN SARGSYAN |
| Insulation | 12/7/2023 | Conditional Approval | ARAM AVEDISIAN |
| Interior/Exterior Lathing | 12/7/2023 | Approved | ARAM AVEDISIAN |
| Shower Pan | 12/7/2023 | Approved | ARAM AVEDISIAN |
| BUILDING-Rough-Frame | 12/20/2023 | Approved | ARAM AVEDISIAN |
| Drywall Nailing | 12/20/2023 | Approved | ARAM AVEDISIAN |
| Insulation | 12/20/2023 | Approved | ARAM AVEDISIAN |
| Final | 7/12/2024 | Corrections Issued | KEVIN SARGSYAN |
| SGSOV-Seismic Gas S/O Valve | 7/12/2024 | SGSOV Not Ready | KEVIN SARGSYAN |
| Smoke Detectors | 7/12/2024 | Corrections Issued | KEVIN SARGSYAN |
| Final | 9/27/2024 | Permit Finaled | ARAM AVEDISIAN |
| SGSOV-Seismic Gas S/O Valve | 9/27/2024 | SGSOV Approved | ARAM AVEDISIAN |
| Smoke Detectors | 9/27/2024 | Approved | ARAM AVEDISIAN |