725 S BARRINGTON AVE 211-UNIT22 90049
Certificate Information: 725 S BARRINGTON AVE 211-UNIT22 90049
- Application / Permit
- 23016-10000-15077
- Plan Check / Job No.
- B23LA08637
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- EPLAN Remodel Master Bathroom within 2Bed 2 Bath Condominium. Summary: In 5.5'x5.5' Bathroom: Replace Shower (Shower tile, framing, waterproofing, flooring and pluming for valving) Shower pan will be replaced with a curbless (flush) floor. Replacing single to dual vanity.
- Permit Issued
- Issued on 8/22/2023
- Issuing Office
- Current Status
- Permit Finaled on 1/22/2024
Permit Application Status History
| Submitted | 5/10/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 5/16/2023 | RACHEL BEYENE |
| Corrections Issued | 5/17/2023 | RACHEL BEYENE |
| Plan Check Approved | 7/12/2023 | MICHAEL LOPEZ |
| Issued | 8/22/2023 | APPLICANT |
| Permit Finaled | 1/22/2024 | CASIMIR BRITTON |
Permit Application Clearance Information
| Tenant Habitability Plan | Cleared | 6/20/2023 | RICARDO BOHORQUEZ |
Contact Information
| Contractor | Create Construction Inc; Lic. No.: 1070134-B | , |
| Engineer | Schlosser,, Leonard Allen; Lic. No.: S5898 | 12223 HIGHLAND AVE STE 106-878 RANCHO CUCAMONGA, CA 91739 |
Inspector Information
| CASIMIR BRITTON, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
| SHAVONNE ESPINOZA, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 10/25/2023 | Not Ready for Inspection | CASIMIR BRITTON |
| Wood Frame | 10/31/2023 | Not Ready for Inspection | CASIMIR BRITTON |
| Special/Order Compliance | 11/2/2023 | Approved | CASIMIR BRITTON |
| Wood Frame | 11/2/2023 | Approved | CASIMIR BRITTON |
| Drywall Nailing | 11/8/2023 | Approved | MICHAEL PETRUSKO |
| Interior/Exterior Lathing | 11/8/2023 | Approved | MICHAEL PETRUSKO |
| Final | 1/19/2024 | Not Ready for Inspection | CASIMIR BRITTON |
| SGSOV-Seismic Gas S/O Valve | 1/19/2024 | SGSOV Not Ready | CASIMIR BRITTON |
| Smoke Detectors | 1/19/2024 | Not Ready for Inspection | CASIMIR BRITTON |
| Final | 1/22/2024 | Permit Finaled | CASIMIR BRITTON |
| SGSOV-Seismic Gas S/O Valve | 1/22/2024 | SGSOV Approved | CASIMIR BRITTON |
| Smoke Detectors | 1/22/2024 | Approved | CASIMIR BRITTON |