1822 S MANSFIELD AVE 90019

Certificate Information: 1822 S MANSFIELD AVE 90019

Application / Permit
23016-10000-13004
Plan Check / Job No.
B23LA07615
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior/exterior remodel of an existing single-family dwelling. All work done per engineered design.
Permit Issued
Issued on 5/15/2023
Issuing Office
Metro
Current Status
Permit Finaled on 9/15/2023

Permit Application Status History

Submitted 4/25/2023 APPLICANT
Assigned to Plan Check Engineer 4/25/2023 RAHEL BEYENE
Corrections Issued 4/25/2023 RAHEL BEYENE
Plan Check Approved 5/15/2023 DANIEL SMILEY
Issued 5/15/2023 APPLICANT
Permit Finaled 9/14/2023 LILIANA PORTILLO

Permit Application Clearance Information

No Data Available.

Contact Information

Architect Vanessa, Jauregui; Lic. No.: C38627 4510 10TH AVE      LOS ANGELES, CA 90043
Contractor Owner-Builder       ,
Engineer Moeini,, Soheil; Lic. No.: C84000 11022 SANTA MONICA BLVD STE 440      LOS ANGELES, CA 90025

Inspector Information

DAVID WILLIAMS, (213) 202-3126 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Other (see comments) 5/26/2023 Conditional Approval JOSE AVILA
Footing/Foundation/Slab 5/30/2023 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 6/6/2023 Approved JOSE AVILA
PLUMBING-Rough 6/16/2023 Corrections Issued JOSE AVILA
BUILDING-Rough-Frame 6/26/2023 Corrections Issued JOSE AVILA
ELECTRICAL-Rough 6/26/2023 Approved JOSE AVILA
HVAC-Rough 6/26/2023 Corrections Issued JOSE AVILA
PLUMBING-Rough 6/26/2023 Approved JOSE AVILA
BUILDING-Rough-Frame 7/3/2023 Partial Approval JOSE AVILA
HVAC-Rough 7/3/2023 Approved JOSE AVILA
Insulation 7/3/2023 Approved JOSE AVILA
Deputy Wood Construction 7/5/2023 Conditional Approval JOSE AVILA
Drywall Nailing 7/6/2023 Approved JOSE AVILA
Interior/Exterior Lathing 7/6/2023 Approved JOSE AVILA
Interior/Exterior Lathing 8/8/2023 Approved LILIANA PORTILLO
Shower Pan 8/8/2023 Approved LILIANA PORTILLO
Final 8/28/2023 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 8/28/2023 SGSOV Not Ready LILIANA PORTILLO
Smoke Detectors 8/28/2023 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Final 9/8/2023 Corrections Issued JOSE AVILA
HVAC-Final 9/8/2023 Corrections Issued JOSE AVILA
Smoke Detectors 9/8/2023 Approved JOSE AVILA
ELECTRICAL-Final 9/14/2023 Approved LILIANA PORTILLO
Final 9/14/2023 Permit Finaled LILIANA PORTILLO
HVAC-Final 9/14/2023 Approved LILIANA PORTILLO
PLUMBING-Final 9/14/2023 Approved LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 9/14/2023 SGSOV Approved LILIANA PORTILLO