238 S THORNE ST 1-2 90042

Certificate Information: 238 S THORNE ST 1-2 90042

Application / Permit
23016-10000-12250
Plan Check / Job No.
B23LA07241
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
Interior remodel of rear unit of existing duplex to replace bathroom & kitchen fixture/cabinets, create laundry room in existing storage room, relocate water heater, replace existing wall heather, and new minisplit. No additional square footage, no change in overall height. NO EXTERIOR WORK/ALTERATION.
Permit Issued
Issued on 5/4/2023
Issuing Office
Metro
Current Status
Permit Finaled on 2/25/2025

Permit Application Status History

Submitted 4/19/2023 APPLICANT
Assigned to Plan Check Engineer 4/19/2023 JOSEPH RAFOLS
Corrections Issued 4/19/2023 JOSEPH RAFOLS
Plan Check Approved 5/4/2023 VICTOR CHEN
Issued 5/4/2023 APPLICANT
Permit Finaled 2/24/2025 LILIANA PORTILLO

Permit Application Clearance Information

HPOZ Cleared 4/26/2023 MICAELA TORRES-GIL

Contact Information

Contractor Owner-Builder       ,

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Drywall Nailing 9/19/2023 Approved ROY SPAULDING
Final 1/16/2024 Corrections Issued CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 1/16/2024 SGSOV Not Ready CRAIG VAUGHAN
Smoke Detectors 1/16/2024 Approved CRAIG VAUGHAN
Final 1/23/2024 Corrections Issued ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 1/23/2024 SGSOV Not Ready ROY SPAULDING
Final 2/5/2025 Corrections Issued CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 2/5/2025 SGSOV Not Ready CRAIG DAVIS
Final 2/7/2025 Corrections Issued CRAIG DAVIS
SGSOV-Seismic Gas S/O Valve 2/7/2025 SGSOV Not Ready CRAIG DAVIS
Final 2/24/2025 Permit Finaled LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 2/24/2025 SGSOV Approved LILIANA PORTILLO