6114 N FIGUEROA ST 90042

Certificate Information: 6114 N FIGUEROA ST 90042

Application / Permit
23016-10000-08566
Plan Check / Job No.
B23LA05280
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(16) Retail
Work Description
eplan. Change of use from Office use to Retail. Install two new storefront windows within the existing arches at the front. Create two new unisex ADA restrooms. Add steel moment frame along the line of the storefront windows for lateral support. No change in floor area, setbacks or building height.
Permit Issued
Issued on 10/13/2023
Issuing Office
Current Status
CofO Issued on 8/8/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/2/2023 APPLICANT
Assigned to Plan Check Engineer 4/20/2023 QUAN NGHIEM
Corrections Issued 4/28/2023 QUAN NGHIEM
Quality Review Completed 5/2/2023 CHAD DOI
Applicant returned to address corrections 8/10/2023 QUAN NGHIEM
Plan Check Approved 9/11/2023 QUAN NGHIEM
Issued 10/13/2023 APPLICANT
CofO in Progress 8/7/2024 RAMAZANALI ALMASI
Permit Finaled 8/8/2024 RAFAEL ESPINOZA
CofO Issued 8/8/2024 RAFAEL ESPINOZA
Permit Finaled 8/8/2024 RAFAEL ESPINOZA

Permit Application Clearance Information

Metro Rail approval Cleared 5/8/2023 JENNIFER SU
"Q" conditions Cleared 5/10/2023 STEVEN WECHSLER
ZA Case Cleared 5/10/2023 STEVEN WECHSLER
Specific Plan Cleared 5/15/2023 SEGAL ISMAEL
Sewer availability Cleared 5/30/2023 HUGO LOPEZ
Eng Process Fee Ord 176,300 Cleared 5/31/2023 HUGO LOPEZ
Specific Plan Cleared 6/5/2023 PABLO ESTRADA
DAS Clearance Cleared 7/16/2023 ELIZABETH TOMS

Contact Information

Architect Tomalevski,, Vladimir Bogdanov; Lic. No.: C22417 8416 HAROLD WAY   L&V TOMALEVSKI ARCHITECTS, INC.    LOS ANGELES, CA 90069
Contractor Owner-Builder       ,
Engineer Tan,, Charles; Lic. No.: NA4758       ,

Inspector Information

SEAN POMISH, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI
RAFAEL CORTES, (213) 202-2643 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/15/2023 Not Ready for Inspection RAFAEL CORTES
Special/Order Compliance 11/16/2023 Approved RAFAEL CORTES
Footing/Foundation/Slab 12/1/2023 Partial Approval JEROME BLACKWOOD
Reinforced Concrete Frame 12/5/2023 Approved RAMAZANALI ALMASI
Wood Frame 12/5/2023 Approved RAMAZANALI ALMASI
Drywall Nailing 12/7/2023 Not Ready for Inspection RAMAZANALI ALMASI
Final 12/7/2023 Not Ready for Inspection RAMAZANALI ALMASI
Reinforced Masonry Frame 12/7/2023 Approved RAMAZANALI ALMASI
SGSOV-Seismic Gas S/O Valve 12/7/2023 SGSOV Not Ready RAMAZANALI ALMASI
Smoke Detectors 12/7/2023 Approved RAMAZANALI ALMASI
Structural Steel Frame 12/7/2023 Approved RAMAZANALI ALMASI
Drywall Nailing 4/16/2024 Not Ready for Inspection RAMAZANALI ALMASI
Final 4/16/2024 Not Ready for Inspection RAMAZANALI ALMASI
Pre-Inspection 4/16/2024 Partial Inspection RAMAZANALI ALMASI
SGSOV-Seismic Gas S/O Valve 4/16/2024 SGSOV Not Ready RAMAZANALI ALMASI
Special/Order Compliance 6/13/2024 Not Ready for Inspection RAMAZANALI ALMASI
Floor/Roof Diaphrgm/Shear Wall 6/26/2024 Partial Approval RAMAZANALI ALMASI
Wood Frame 6/26/2024 Partial Approval RAMAZANALI ALMASI
Light Gage Steel Frame 7/11/2024 Not Ready for Inspection RAMAZANALI ALMASI
Wood Frame 7/11/2024 Approved RAMAZANALI ALMASI
Insulation 7/12/2024 Approved RAMAZANALI ALMASI
Drywall Nailing 7/17/2024 Not Ready for Inspection RAMAZANALI ALMASI
Drywall Nailing 7/18/2024 Approved RAMAZANALI ALMASI
Final 7/31/2024 Not Ready for Inspection RAMAZANALI ALMASI
SGSOV-Seismic Gas S/O Valve 7/31/2024 SGSOV Approved RAMAZANALI ALMASI
Final 8/5/2024 Conditional Approval RAMAZANALI ALMASI
Final 8/7/2024 OK to Issue CofO RAMAZANALI ALMASI