1251 S MANHATTAN PL UNIT 301 90019
Certificate Information: 1251 S MANHATTAN PL UNIT 301 90019
- Application / Permit
- 23016-10000-08174
- Plan Check / Job No.
- B23LA05062
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- THE PROPOSED WORK IS TO REPAIR APPROX. 50 SQ FT OF ROOF SHEATHING AND REINFORCE THE RIP STRIPS ABOVE THE ROOF JOISTS AT THE LOCATION OF THE ROOF SHEATHING REPAIR. THERE ARE 3 BROKEN WINDOWS THAT ARE TO BE REMOVED AND REPLACED WITHIN THE UNIT. THE FIRE DAMAGE FINISHES ARE TO BE REMOVED AND REPLACED TO MATCH EXISTING. THE REPAIRS ARE INTENDED TO REPAIR THE FRAMING DAMAGE AND TO RESTORE THE PROPERTY TO ITS PRE- DAMAGED CONDITION, "LIKE-FOR-LIKE"
- Permit Issued
- Issued on 5/11/2023
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 10/19/2023
Permit Application Status History
| Submitted | 3/21/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 3/21/2023 | DANIEL SANJUAN |
| Corrections Issued | 3/21/2023 | DANIEL SANJUAN |
| Plan Check Approved | 5/4/2023 | MINA HABILI |
| Issued | 5/11/2023 | APPLICANT |
| Permit Finaled | 9/11/2023 | DARRYL ARNOLD |
Permit Application Clearance Information
| CPC | Cleared | 3/23/2023 | ASHLEY RODARTE |
| ZA Case | Cleared | 3/23/2023 | ASHLEY RODARTE |
| ZA Case | Cleared | 3/23/2023 | ASHLEY RODARTE |
| ZA Case | Cleared | 3/23/2023 | ASHLEY RODARTE |
| Tenant Habitability Plan | Cleared | 3/30/2023 | ISMAEL HERNANDEZ |
| HPOZ | Cleared | 4/7/2023 | AMANDA KAINER |
Contact Information
| Contractor | Restoration Management Company; Lic. No.: 765595-B | 4142 POINT EDEN WAY HAYWARD, CA 94545 |
| Engineer | Ficcadenti,, Seb John; Lic. No.: S2525 | 52 BOULDER VIEW IRVINE, CA 92603 |
Inspector Information
| IAN BLINN, (213) 482-7361 | Office Hours: 7:00-8:00 AM MON-FRI |
| CHRISTOPHER BLACKWOOD, (213) 482-7361 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Wood Frame | 7/19/2023 | Not Ready for Inspection | ALFREDO LOPEZ |
| Insulation | 7/21/2023 | Partial Approval | ALFREDO LOPEZ |
| Wood Frame | 7/21/2023 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 7/26/2023 | Partial Approval | ALFREDO LOPEZ |
| Drywall Nailing | 7/28/2023 | Partial Approval | JEROME BLACKWOOD |
| Final | 9/11/2023 | Permit Finaled | DARRYL ARNOLD |
| SGSOV-Seismic Gas S/O Valve | 9/11/2023 | SGSOV Approved | DARRYL ARNOLD |
| Smoke Detectors | 9/11/2023 | Approved | DARRYL ARNOLD |