15821 W VENTURA BLVD 91436
Certificate Information: 15821 W VENTURA BLVD 91436
- Application / Permit
- 23016-10000-07410
- Plan Check / Job No.
- B22LA26986
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (15) Telecommunication Transmitter - wireless
- Work Description
- SECTOR SCOPE OF WORK -Install (6) proposed 6'-0" panel antennas (2 per sector) -Install (3) proposed FRP screen boxes (1 per sector) -Install (12) proposed RRUs (4 per sector) -Install (3) proposed surge suppression device ( 1 per sector) -Install (3) proposed hybrid cables ( 1 per sector) -Install proposed cable tray on roof -Install proposed jumpers from RRU to antennas as required EQUIPMENT SCOPE OF WORK -Install (1) proposed equipment platform with utility H-Frame -Install (1) proposed BBU in cabinet -Install (1) proposed equipment cabinet -Install (1) proposed power conduit -Install (1) proposed TELCO conduit -Install (1) proposed NEMA 3 TELCO-Fiber box -Install (1) proposed GPS Antenna -Install camlock gen lug intersect at ground level
- Permit Issued
- Issued on 4/10/2023
- Issuing Office
- Current Status
- Permit Finaled on 12/8/2023
Permit Application Status History
| Submitted | 3/14/2023 | APPLICANT |
| Assigned to Plan Check Engineer | 3/20/2023 | RACHEL BEYENE |
| Corrections Issued | 3/21/2023 | RACHEL BEYENE |
| Plan Check Approved | 3/31/2023 | JAHANSHAH POURHASSAN |
| Issued | 4/10/2023 | APPLICANT |
| Permit Finaled | 12/8/2023 | STEVEN LEVITT |
Permit Application Clearance Information
| Miscellaneous | Cleared | 3/30/2023 | SANTOS SANCHEZ |
| Miscellaneous | Cleared | 3/30/2023 | SANTOS SANCHEZ |
| ZA Case | Cleared | 3/30/2023 | SANTOS SANCHEZ |
Contact Information
| Contractor | Procell; Lic. No.: 951819-B | , |
| Contractor | Process Cellular Inc; Lic. No.: 951819-B | , |
| Engineer | Connell,, Daniel Michael; Lic. No.: NA62543 | , |
Inspector Information
| SEAN GRIFFITH, (818) 374-1102 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Structural Steel Frame | 9/28/2023 | Not Ready for Inspection | STEVEN LEVITT |
| Wood Frame | 9/28/2023 | Not Ready for Inspection | STEVEN LEVITT |
| Structural Steel Frame | 10/27/2023 | Approved | STEVEN LEVITT |
| Final | 12/8/2023 | Permit Finaled | STEVEN LEVITT |
| SGSOV-Seismic Gas S/O Valve | 12/8/2023 | SGSOV Approved | STEVEN LEVITT |
| Smoke Detectors | 12/8/2023 | Approved | STEVEN LEVITT |