725 S BARRINGTON AVE #306 90049
Certificate Information: 725 S BARRINGTON AVE #306 90049
- Application / Permit
- 23016-10000-07038
- Plan Check / Job No.
- X23LA02668
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- (1) Kitchen/ (2) bathroom remodel for residential buildings (no structural changes). (10) Window and (2) door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150(b) 1B of Title 24.
- Permit Issued
- Issued on 3/15/2023
- Issuing Office
- Current Status
- Permit Finaled on 5/9/2024
Permit Application Status History
| Issued | 3/15/2023 | SHANNON HAAS |
| Permit Finaled | 5/9/2024 | CASIMIR BRITTON |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Pacific1 Construction Corporation; Lic. No.: 1054334-B | 123 N HAYWORTH AVE #5 LOS ANGELES, CA 90048 |
Inspector Information
| CASIMIR BRITTON, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
| SHAVONNE ESPINOZA, (310) 914-3913 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Insulation | 5/31/2023 | Approved | ALAN NOVAK |
| Pre-Inspection | 5/31/2023 | Approved | ALAN NOVAK |
| Interior/Exterior Lathing | 6/2/2023 | Not Ready for Inspection | ALAN NOVAK |
| Wood Frame | 6/2/2023 | Not Ready for Inspection | ALAN NOVAK |
| Drywall Nailing | 6/13/2023 | Approved | ALAN NOVAK |
| Interior/Exterior Lathing | 6/13/2023 | Approved | ALAN NOVAK |
| Final | 1/10/2024 | Not Ready for Inspection | CASIMIR BRITTON |
| SGSOV-Seismic Gas S/O Valve | 1/10/2024 | SGSOV Not Ready | CASIMIR BRITTON |
| Smoke Detectors | 1/10/2024 | Not Ready for Inspection | CASIMIR BRITTON |
| Final | 2/23/2024 | Not Ready for Inspection | CASIMIR BRITTON |
| SGSOV-Seismic Gas S/O Valve | 2/23/2024 | SGSOV Not Ready | CASIMIR BRITTON |
| Smoke Detectors | 2/23/2024 | Not Ready for Inspection | CASIMIR BRITTON |
| SGSOV-Seismic Gas S/O Valve | 2/29/2024 | SGSOV Not Ready | CASIMIR BRITTON |
| Final | 5/9/2024 | Permit Finaled | CASIMIR BRITTON |
| SGSOV-Seismic Gas S/O Valve | 5/9/2024 | SGSOV Approved | CASIMIR BRITTON |
| Smoke Detectors | 5/9/2024 | Approved | CASIMIR BRITTON |