312 S COLUMBIA AVE 90017
Certificate Information: 312 S COLUMBIA AVE 90017
- Application / Permit
- 23016-10000-06728
- Plan Check / Job No.
- X23LA02546
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- Apartment
- Primary Use
- (5) Apartment
- Work Description
- Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over existing solid sheathing ___30___Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). Forresidential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by CoolRoof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6,Section 141.0(b) 2B.
- Permit Issued
- Issued on 3/7/2023
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 4/17/2023
Permit Application Status History
| Issued | 3/7/2023 | APPLICANT |
| Permit Finaled | 4/14/2023 | RAMAZANALI ALMASI |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Rapid Roofing; Lic. No.: 991750-C39 | 161 WEST VERNON AVENUE LOS ANGELES, CA 90037 |
Inspector Information
| JEROME BLACKWOOD, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
| REGINA MENDEZ, (213) 213-5353 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 3/17/2023 | Not Ready for Inspection | VAHE KELEDJIAN |
| Floor/Roof Diaphrgm/Shear Wall | 4/10/2023 | Approved | RAMAZANALI ALMASI |
| Final | 4/14/2023 | Permit Finaled | RAMAZANALI ALMASI |
| SGSOV-Seismic Gas S/O Valve | 4/14/2023 | SGSOV Approved | RAMAZANALI ALMASI |
| Smoke Detectors | 4/14/2023 | Approved | RAMAZANALI ALMASI |