3727 S TRINITY ST 90011

Certificate Information: 3727 S TRINITY ST 90011

Application / Permit
23016-10000-03872
Plan Check / Job No.
X23LA01609
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
1 Kitchen/ 1 bathroom remodel for residential buildings (no structural changes combine with plumbing and electrical Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over new solid sheathing _850_____Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141(b) 2B 5 door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) 1B of Title 24
Permit Issued
Issued on 2/10/2023
Issuing Office
Metro
Current Status
Permit Finaled on 3/15/2025

Permit Application Status History

Issued 2/10/2023 APPLICANT
Permit Finaled 3/14/2025 ALEJANDRO DE ARTOLA

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Marome Construction Company; Lic. No.: 685693-B P O BOX 6773      TORRANCE, CA 90504

Inspector Information

ALEJANDRO DE ARTOLA, (213) 202-3128 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/17/2023 Corrections Issued BRENDAN MORELLI
Footing/Foundation/Slab 10/2/2024 Approved SABAS ALONSO
ELECTRICAL-Rough 11/8/2024 Not Ready for Inspection CRAIG DAVIS
HVAC-Rough 11/8/2024 Not Ready for Inspection CRAIG DAVIS
PLUMBING-Rough 11/8/2024 Not Ready for Inspection CRAIG DAVIS
ELECTRICAL-Rough 11/13/2024 Corrections Issued SABAS ALONSO
HVAC-Rough 11/13/2024 Corrections Issued SABAS ALONSO
PLUMBING-Rough 11/13/2024 Corrections Issued SABAS ALONSO
ELECTRICAL-Rough 11/18/2024 Corrections Issued ALEJANDRO DE ARTOLA
PLUMBING-Rough 11/18/2024 Approved ALEJANDRO DE ARTOLA
ELECTRICAL-Rough 11/22/2024 Corrections Issued ALEJANDRO DE ARTOLA
BUILDING-Rough-Frame 11/25/2024 Approved ALEJANDRO DE ARTOLA
ELECTRICAL-Rough 11/25/2024 Approved ALEJANDRO DE ARTOLA
HVAC-Rough 11/25/2024 Approved ALEJANDRO DE ARTOLA
Insulation 11/26/2024 Approved ALEJANDRO DE ARTOLA
Drywall Nailing 12/13/2024 Approved ANTHONY RAMOS
Interior/Exterior Lathing 12/13/2024 Approved ANTHONY RAMOS
ELECTRICAL-Final 3/11/2025 Corrections Issued ALEJANDRO DE ARTOLA
Final 3/11/2025 Corrections Issued ALEJANDRO DE ARTOLA
HVAC-Final 3/11/2025 Approved ALEJANDRO DE ARTOLA
PLUMBING-Final 3/11/2025 Corrections Issued ALEJANDRO DE ARTOLA
SGSOV-Seismic Gas S/O Valve 3/11/2025 SGSOV Not Ready ALEJANDRO DE ARTOLA
Smoke Detectors 3/11/2025 Approved ALEJANDRO DE ARTOLA
ELECTRICAL-Final 3/14/2025 Approved ALEJANDRO DE ARTOLA
Final 3/14/2025 Permit Finaled ALEJANDRO DE ARTOLA
PLUMBING-Final 3/14/2025 Approved ALEJANDRO DE ARTOLA
SGSOV-Seismic Gas S/O Valve 3/14/2025 SGSOV Approved ALEJANDRO DE ARTOLA