17224 S HOOVER ST 90247

Certificate Information: 17224 S HOOVER ST 90247

Application / Permit
23016-10000-03317
Plan Check / Job No.
B23LA02005
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
FIRE DAMAGED REPAIR TO (E) PARTIAL ROOF, REPLACE INTERIOR DRYWALL, REPLACE WINDOWS/DOORS AT SAME LOCATION CONVERT (E) CLOSETS AT 2ND FLOOR TO BATH WITH 2 NEW CLOSETS. NO STRUCTURAL OR LOAD BEARING MEMBERS BEING DEMOLISHED OR REPAIRED. NO NEW AREA PROPOSED OR CHANGE IN DIMENSIONS OF BUILDING.
Permit Issued
Issued on 2/15/2023
Issuing Office
Metro
Current Status
Permit Finaled on 10/30/2023

Permit Application Status History

Submitted 2/7/2023 APPLICANT
Assigned to Plan Check Engineer 2/7/2023 SHANGQIN XIE
Corrections Issued 2/7/2023 SHANGQIN XIE
Plan Check Approved 2/15/2023 DANIEL SMILEY
Issued 2/15/2023 APPLICANT
Permit Finaled 10/30/2023 JAMES CHAVEZ

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Evr Gard Construction; Lic. No.: 621683-B 10736 JEFFERSON BLVD #410      CULVER CITY, CA 90230

Inspector Information

BEN MOLSTAD, (310) 732-4557 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 3/9/2023 Not Ready for Inspection JAMES CHAVEZ
MERV13>=Rough 3/9/2023 Not Ready for Inspection JAMES CHAVEZ
PLUMBING-Rough 3/9/2023 Approved JAMES CHAVEZ
BUILDING-Rough-Frame 7/5/2023 Not Ready for Inspection JAMES CHAVEZ
ELECTRICAL-Rough 7/5/2023 Corrections Issued JAMES CHAVEZ
HVAC-Rough 7/5/2023 Not Ready for Inspection JAMES CHAVEZ
MERV13>=Rough 7/5/2023 Not Ready for Inspection JAMES CHAVEZ
BUILDING-Rough-Frame 7/10/2023 Approved JAMES CHAVEZ
ELECTRICAL-Rough 7/10/2023 Approved JAMES CHAVEZ
HVAC-Rough 7/10/2023 Approved JAMES CHAVEZ
MERV13>=Rough 7/10/2023 Approved JAMES CHAVEZ
Insulation 7/18/2023 Approved ANSON MAGLASANG
Drywall Nailing 7/27/2023 Approved JAMES CHAVEZ
ELECTRICAL-Final 10/11/2023 Not Ready for Inspection JAMES CHAVEZ
Final 10/11/2023 Not Ready for Inspection JAMES CHAVEZ
HVAC-Final 10/11/2023 Not Ready for Inspection JAMES CHAVEZ
MERV13>=Final 10/11/2023 Not Ready for Inspection JAMES CHAVEZ
PLUMBING-Final 10/11/2023 Approved JAMES CHAVEZ
SGSOV-Seismic Gas S/O Valve 10/11/2023 SGSOV Not Ready JAMES CHAVEZ
Smoke Detectors 10/11/2023 Not Ready for Inspection JAMES CHAVEZ
Final 10/25/2023 Corrections Issued JAMES CHAVEZ
MERV13>=Final 10/25/2023 Approved JAMES CHAVEZ
SGSOV-Seismic Gas S/O Valve 10/25/2023 SGSOV Not Ready JAMES CHAVEZ
Smoke Detectors 10/25/2023 Approved JAMES CHAVEZ
ELECTRICAL-Final 10/30/2023 Approved JAMES CHAVEZ
Final 10/30/2023 Permit Finaled JAMES CHAVEZ
HVAC-Final 10/30/2023 Approved JAMES CHAVEZ
PLUMBING-Final 10/30/2023 Approved JAMES CHAVEZ
SGSOV-Seismic Gas S/O Valve 10/30/2023 SGSOV Approved JAMES CHAVEZ
Service/Power Release 10/30/2023 Approved JAMES CHAVEZ