914-916 N HYPERION AVE 90029

Certificate Information: 914-916 N HYPERION AVE 90029

Application / Permit
23014-30000-01516
Plan Check / Job No.
B23WL01021
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(2) Duplex
Work Description
New 10'6" X 7' addition to 1st floor unit of (e) duplex to enlarge the kitchen with 2nd floor deck above , ,replace existing windows and doors, repair hardscape and stairs-on-grade, all work per engineering
Permit Issued
Issued on 8/9/2023
Issuing Office
Valley
Current Status
CofO Issued on 9/17/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 4/18/2023 APPLICANT
Assigned to Plan Check Engineer 4/27/2023 RARES BODEA
Corrections Issued 5/1/2023 RARES BODEA
Quality Review Completed 5/4/2023 STEVEN KIM
Building Plans Picked Up 5/5/2023 APPLICANT
Plan Check Approved 7/25/2023 RARES BODEA
Issued 8/9/2023 APPLICANT
CofO in Progress 7/15/2024 FREDDIE RIVERA
No Progress 7/15/2024 FREDDIE RIVERA
CofO in Progress 7/15/2024 FREDDIE RIVERA
CofO Issued 9/17/2024 DEROLD HAUFF
Permit Finaled 9/17/2024 DEROLD HAUFF

Permit Application Clearance Information

Tenant Habitability Plan Cleared 5/10/2023 RICARDO BOHORQUEZ
Roof/Waste drainage to street Cleared 5/26/2023 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 6/1/2023 ADRIAN SANCHEZ
Grading Pre-Inspection Cleared 7/25/2023 RARES BODEA

Contact Information

Contractor Maven Associates Inc The; Lic. No.: 1085625-B 501 WEST GLENOAKS BLVD #756      GLENDALE, CA 91202
Engineer Vasquez,, Luis Fernando; Lic. No.: C56232 375 LA MIRADA AVENUE      SAN MARINO, CA 91108

Inspector Information

FREDDIE RIVERA, (213) 202-3437 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Piling/Pier/Caisson 10/13/2023 Partial Inspection FREDDIE RIVERA
Reinforced Concrete Frame 10/13/2023 Partial Inspection FREDDIE RIVERA
Excavation/Setback/Form/Re-Bar 10/24/2023 Approved FREDDIE RIVERA
Footing/Foundation/Slab 10/24/2023 Approved FREDDIE RIVERA
PLUMBING-Rough 10/24/2023 Partial Approval FREDDIE RIVERA
Piling/Pier/Caisson 10/24/2023 Approved FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 11/13/2023 Approved FREDDIE RIVERA
PLUMBING-Rough 11/13/2023 Corrections Issued FREDDIE RIVERA
Floor/Roof Diaphrgm/Shear Wall 11/20/2023 Conditional Approval FREDDIE RIVERA
PLUMBING-Rough 11/20/2023 Approved FREDDIE RIVERA
Deputy Wood Construction 11/28/2023 Conditional Approval FREDDIE RIVERA
BUILDING-Rough-Frame 11/29/2023 Conditional Approval FREDDIE RIVERA
ELECTRICAL-Rough 11/29/2023 Partial Inspection FREDDIE RIVERA
Green Building Rough 11/29/2023 Partial Inspection FREDDIE RIVERA
HVAC-Rough 11/29/2023 Partial Approval FREDDIE RIVERA
ELECTRICAL-Rough 12/6/2023 Corrections Issued FREDDIE RIVERA
Interior/Exterior Lathing 12/6/2023 Approved FREDDIE RIVERA
Shower Pan 12/6/2023 Partial Inspection FREDDIE RIVERA
ELECTRICAL-Rough 12/7/2023 Approved FREDDIE RIVERA
Insulation 12/7/2023 Approved FREDDIE RIVERA
Shower Pan 12/7/2023 Approved FREDDIE RIVERA
Drywall Nailing 12/12/2023 Not Ready for Inspection THOMAS LOGRASSO
Drywall Nailing 12/14/2023 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 2/16/2024 Partial Inspection FREDDIE RIVERA
Final 2/16/2024 Partial Inspection FREDDIE RIVERA
Green Building Rough 2/16/2024 Partial Inspection FREDDIE RIVERA
Smoke Detectors 2/16/2024 Partial Inspection FREDDIE RIVERA
ELECTRICAL-Final 2/21/2024 Corrections Issued FREDDIE RIVERA
HVAC-Final 2/21/2024 Approved FREDDIE RIVERA
PLUMBING-Final 2/21/2024 Approved FREDDIE RIVERA
BUILDING-Rough-Frame 2/23/2024 Approved FREDDIE RIVERA
ELECTRICAL-Final 2/23/2024 Partial Inspection FREDDIE RIVERA
Final 2/23/2024 Corrections Issued FREDDIE RIVERA
Green Building Final 2/23/2024 Approved FREDDIE RIVERA
Green Building Rough 2/23/2024 Approved FREDDIE RIVERA
Smoke Detectors 2/23/2024 Approved FREDDIE RIVERA
Final 4/17/2024 OK to Issue CofO FREDDIE RIVERA
Special/Order Compliance 7/16/2024 Corrections Issued FREDDIE RIVERA