8026 S DUNFIELD AVE 90045

Certificate Information: 8026 S DUNFIELD AVE 90045

Application / Permit
23014-20000-05360
Plan Check / Job No.
B23VN17837
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE ALL THE EXTERIOR AND INTERIOR WALLS OF AN EXISTING 1 STORY DWELLING EXCEPT 19'5" X 20'4" ATTACHED TWO CAR GARAGE AND BUILD AN IRREGULAR SHAPED 54' X 61' TWO STORY SFD WITH HABITABLE BASEMENT , NFPA-13D FIRE SPRINKLERS REQURIED THROUGHOUT, ALL WORK PER ENGINEERING- SEE COMMENTS
Permit Issued
Issued on 4/11/2024
Issuing Office
West Los Angeles
Current Status
CofO Issued on 9/18/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/28/2023 APPLICANT
Assigned to Plan Check Engineer 1/4/2024 RARES BODEA
Corrections Issued 1/9/2024 RARES BODEA
Quality Review Completed 1/10/2024 STEVEN KIM
Building Plans Picked Up 1/12/2024 APPLICANT
Applicant returned to address corrections 3/29/2024 RARES BODEA
Plan Check Approved 4/4/2024 RARES BODEA
Issued 4/11/2024 APPLICANT
CofO in Progress 9/18/2025 RUBEN RIVAS
Permit Finaled 9/18/2025 RICHARD STEINBACH
Permit Finaled 9/18/2025 RICHARD STEINBACH
CofO Issued 9/18/2025 RICHARD STEINBACH

Permit Application Clearance Information

Specific Plan Cleared 1/23/2024 FREDDY GARCIA
Eng Process Fee Ord 176,300 Cleared 2/1/2024 LIAM ODONOVAN
Sewer availability Cleared 2/1/2024 LIAM ODONOVAN
Trees in Parkway Cleared 2/15/2024 ADALBERTO VERA
Hydrant and Access approval Cleared 3/2/2024 GILBERT URREA
Low Impact Development (LID) Cleared 3/8/2024 PATRICK LOPEZ
Roof/Waste drainage to street Cleared 3/14/2024 LIAM ODONOVAN
Permit Cleared 3/20/2024 ANDREA SAINT-ANTONIN
Excavation more than 5-ft deep Cleared 3/29/2024 CALOSHA APPROVED

Contact Information

Contractor Local Construction Remodeling; Lic. No.: 966738-B 14901 TUBA STREET      MISSION HILLS, CA 91345
Engineer Motavvef,, Nasser; Lic. No.: C40977 15335 MORRISON ST 370      SHERMAN OAKS, CA 91403

Inspector Information

MORRIS JACKSON, (310) 914-3885 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 4/29/2024 Partial Inspection TEMISTOCLES CAAL
Piling/Pier/Caisson 5/9/2024 Partial Approval TEMISTOCLES CAAL
Piling/Pier/Caisson 5/15/2024 Partial Approval TEMISTOCLES CAAL
Special/Order Compliance 5/15/2024 Partial Inspection HERBERT GIRON
Deputy Reinf. Concrete 5/17/2024 Conditional Approval TEMISTOCLES CAAL
Deputy Drilled-In Anchors 8/20/2024 Conditional Approval TEMISTOCLES CAAL
Special/Order Compliance 8/20/2024 Partial Inspection JESUS PINEDA
Underground Mechanical 8/20/2024 Partial Approval TEMISTOCLES CAAL
Footing/Foundation/Slab 8/26/2024 Partial Approval ARAM AVEDISIAN
Footing/Foundation/Slab 9/5/2024 Partial Approval TEMISTOCLES CAAL
Deputy Reinf. Concrete 9/6/2024 Conditional Approval TEMISTOCLES CAAL
Excavation/Setback/Form/Re-Bar 9/23/2024 Partial Approval TEMISTOCLES CAAL
Special/Order Compliance 9/23/2024 Partial Inspection HERBERT GIRON
Deputy Shotcrete 9/24/2024 Conditional Approval DAVID FEILER
Deputy Shotcrete 9/25/2024 Conditional Approval TEMISTOCLES CAAL
Footing/Foundation/Slab 10/24/2024 Approved TEMISTOCLES CAAL
Deputy Wood Construction 11/8/2024 Partial Approval MICHAEL ALLEN
Floor/Roof Diaphrgm/Shear Wall 11/8/2024 Partial Approval MICHAEL ALLEN
Floor/Roof Diaphrgm/Shear Wall 11/27/2024 Partial Approval MICHAEL ALLEN
Wood Frame 11/27/2024 Partial Approval MICHAEL ALLEN
Floor/Roof Diaphrgm/Shear Wall 1/6/2025 Approved MICHAEL ALLEN
HVAC-Rough 1/24/2025 Approved MICHAEL ALLEN
PLUMBING-Rough 1/27/2025 Not Ready for Inspection MICHAEL ALLEN
ELECTRICAL-Rough 1/28/2025 Corrections Issued MICHAEL ALLEN
Gas Test 1/30/2025 Approved MICHAEL ALLEN
PLUMBING-Rough 1/30/2025 Approved MICHAEL ALLEN
BUILDING-Rough-Frame 2/4/2025 Conditional Approval MICHAEL ALLEN
ELECTRICAL-Rough 2/4/2025 Partial Approval MICHAEL ALLEN
Green Building Rough 2/4/2025 Partial Approval MICHAEL ALLEN
Interior/Exterior Lathing 2/4/2025 Partial Approval MICHAEL ALLEN
Insulation 2/12/2025 Approved MICHAEL ALLEN
Shower Pan 2/12/2025 Partial Approval MICHAEL ALLEN
BUILDING-Rough-Frame 2/13/2025 Approved TEMISTOCLES CAAL
Green Building Rough 2/13/2025 Approved TEMISTOCLES CAAL
Insulation 2/13/2025 Approved TEMISTOCLES CAAL
Shower Pan 2/13/2025 Approved TEMISTOCLES CAAL
Verify Sprinkler Sign Off 2/13/2025 Approved TEMISTOCLES CAAL
Drywall Nailing 2/21/2025 Approved BOBBY KEY
Interior/Exterior Lathing 2/24/2025 Approved JAYLIN GRAVITTE
Sewer 3/5/2025 Approved MICHAEL ALLEN
Special/Order Compliance 3/5/2025 Partial Approval RUBEN RIVAS
Underground Mechanical 3/5/2025 Approved MICHAEL ALLEN
HVAC-Final 7/14/2025 Corrections Issued RUBEN RIVAS
Gas Test 7/25/2025 Approved RUBEN RIVAS
HVAC-Final 7/25/2025 Not Ready for Inspection RUBEN RIVAS
HVAC-Rough 7/25/2025 Corrections Issued RUBEN RIVAS
PLUMBING-Final 7/25/2025 Approved RUBEN RIVAS
PLUMBING-Rough 7/25/2025 Approved RUBEN RIVAS
ELECTRICAL-Final 7/29/2025 Approved RUBEN RIVAS
ELECTRICAL-Rough 7/29/2025 Approved RUBEN RIVAS
HVAC-Final 7/29/2025 Approved RUBEN RIVAS
Service/Power Release 7/29/2025 Corrections Issued RUBEN RIVAS
Final 7/30/2025 Corrections Issued RUBEN RIVAS
Green Building Final 7/30/2025 Approved RUBEN RIVAS
SGSOV-Seismic Gas S/O Valve 7/30/2025 SGSOV Approved RUBEN RIVAS
Smoke Detectors 7/30/2025 Approved RUBEN RIVAS
Final 8/6/2025 Corrections Issued RUBEN RIVAS
Service/Power Release 8/6/2025 Approved RUBEN RIVAS
Final 8/29/2025 Partial Approval RUBEN RIVAS
Final 9/12/2025 OK to Issue CofO RUBEN RIVAS