2186 N HERCULES DR 90046

Certificate Information: 2186 N HERCULES DR 90046

Application / Permit
23014-20000-05333
Plan Check / Job No.
B23VN17720
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
CONVERT (E) IRREGULAR SHAPED PATIO COVER AT REAR AND ADD 846 SF IRREGULAR SHAPE FOR NEW MASTER BEDROOM, BATHROOM AND CLOSET. REMODEL (E) SFD AND ADD ROOFTOP DECK. REMOVE 325 SF AT FRONT OF SFD. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 7/16/2024
Issuing Office
Metro
Current Status
Issued on 7/16/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/27/2023 APPLICANT
Assigned to Plan Check Engineer 12/28/2023 RAPHAEL ROSAS
Corrections Issued 1/3/2024 RAPHAEL ROSAS
Quality Review Completed 1/4/2024 STEVEN KIM
Building Plans Picked Up 1/12/2024 APPLICANT
Applicant returned to address corrections 5/9/2024 RAPHAEL ROSAS
Plan Check Approved 5/13/2024 RAPHAEL ROSAS
Issued 7/16/2024 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 1/10/2024 DAVID LOPEZ
BHO/Hillside ordinance Cleared 1/10/2024 DAVID LOPEZ
BHO/Hillside ordinance Cleared 1/10/2024 DAVID LOPEZ
BHO/Hillside ordinance Cleared 1/10/2024 DAVID LOPEZ
Distance to fire station Cleared 2/10/2024 RUEL COLE
Hydrant and Access approval Cleared 2/10/2024 RUEL COLE
Eng Process Fee Ord 176,300 Cleared 3/20/2024 DAVID LOPEZ
Sewer availability Cleared 3/20/2024 DAVID LOPEZ
Low Impact Development (LID) Cleared 4/24/2024 MELINEH AGHAKHABIAN
BHO/Hillside ordinance Cleared 4/30/2024 AMBER CAMPBELL
Roof/Waste drainage to street Cleared 4/30/2024 AMBER CAMPBELL
GPI Written Notices Cleared 5/13/2024 RAPHAEL ROSAS
Grading Pre-Inspection Cleared 5/13/2024 RAPHAEL ROSAS

Contact Information

Contractor Owner-Builder       ,
Engineer Wang,, Hongyu; Lic. No.: C72679 8887 W FALMINGO RD STE 101      LAS VEGAS, NV 89147

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 8/5/2024 Conditional Approval BRIAN SULLIVAN
Footing/Foundation/Slab 8/5/2024 Partial Approval ALIZAH MAYAGOITIA
Underground Mechanical 8/5/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
PLUMBING-Rough 8/12/2024 Partial Approval BRIAN SULLIVAN
Deputy Drilled-In Anchors 8/16/2024 Conditional Approval BRIAN SULLIVAN
Footing/Foundation/Slab 8/16/2024 Partial Approval BRIAN SULLIVAN
Footing/Foundation/Slab 8/20/2024 Not Ready for Inspection BRIAN SULLIVAN
Deputy Reinf. Concrete 8/22/2024 Approved BRIAN SULLIVAN
Footing/Foundation/Slab 8/22/2024 Corrections Issued BRIAN SULLIVAN
Floor/Roof Diaphrgm/Shear Wall 11/1/2024 Partial Approval CRAIG VAUGHAN
PLUMBING-Rough 11/1/2024 Corrections Issued CRAIG VAUGHAN
ELECTRICAL-Rough 12/5/2024 Corrections Issued ALIZAH MAYAGOITIA
HVAC-Rough 12/5/2024 Approved ALIZAH MAYAGOITIA
PLUMBING-Rough 12/5/2024 Approved ALIZAH MAYAGOITIA
Wood Frame 12/5/2024 Not Ready for Inspection ALIZAH MAYAGOITIA
ELECTRICAL-Rough 12/31/2024 Approved ROY SPAULDING
Wood Frame 12/31/2024 Approved ROY SPAULDING
Insulation 1/22/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 1/22/2025 Approved ROY SPAULDING
Green Building Rough 2/4/2025 Not Ready for Inspection ROY SPAULDING
Drywall Nailing 2/6/2025 Approved ROY SPAULDING
Green Building Rough 2/6/2025 Approved ROY SPAULDING
Interior/Exterior Lathing 2/6/2025 Approved ROY SPAULDING
PLUMBING-Final 10/30/2025 Approved ROY SPAULDING
ELECTRICAL-Final 11/4/2025 Corrections Issued ROY SPAULDING
HVAC-Final 11/4/2025 Approved ROY SPAULDING
BUILDING-Rough-Frame 12/2/2025 Approved ROY SPAULDING
ELECTRICAL-Final 12/2/2025 Approved ROY SPAULDING
Final 12/2/2025 Corrections Issued ROY SPAULDING
Footing/Foundation/Slab 12/2/2025 Approved ROY SPAULDING
Green Building Final 12/2/2025 Approved ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 12/2/2025 SGSOV Approved ROY SPAULDING
Smoke Detectors 12/2/2025 Approved ROY SPAULDING