4916-4918 N RIVERTON AVE 91601

Certificate Information: 4916-4918 N RIVERTON AVE 91601

Application / Permit
23014-20000-05311
Plan Check / Job No.
B23VN17672
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
PROPOSE NEW 4 STORY SFD WITH ATTACHED ACCESSORY DWELLING UNIT (PER GCS 65852.2(e)(1)(A))_ BUILDING SHALL BE FULLY SPRINKLER THROUGH OUT WITH NFPA 13 [SEE COMMENTS].
Permit Issued
Issued on 12/24/2024
Issuing Office
Current Status
Issued on 12/24/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/26/2023 APPLICANT
Assigned to Plan Check Engineer 1/19/2024 DAWN MC NULTY
Corrections Issued 2/5/2024 DAWN MC NULTY
Quality Review Completed 2/8/2024 OMID HEDAYAT
Applicant returned to address corrections 3/4/2024 DAWN MC NULTY
Applicant returned to address corrections 4/22/2024 DAWN MC NULTY
Applicant returned to address corrections 5/21/2024 DAWN MC NULTY
Plan Check Approved 10/18/2024 DAWN MC NULTY
Plan Check Approved 12/19/2024 INTERNET PERMIT
Issued 12/24/2024 APPLICANT

Permit Application Clearance Information

Address approval Cleared 2/6/2024 CARLOS AGUILERA
Eng Process Fee Ord 176,300 Cleared 2/6/2024 CARLOS AGUILERA
Highway dedication Cleared 2/6/2024 CARLOS AGUILERA
Sewer availability Cleared 2/6/2024 CARLOS AGUILERA
CPC Cleared 2/20/2024 YINGSHI HUANG
Trees in Parkway Cleared 3/13/2024 ADALBERTO VERA
Permit Cleared 3/28/2024 CARLOS AGUILERA
Frnt yard landscape/Water mgmt Cleared 4/18/2024 YINGSHI HUANG
Hydrant and Access approval Cleared 4/18/2024 RUEL COLE
Building over 36-ft Cleared 4/22/2024 CALOSHA APPROVED
Miscellaneous Cleared 4/22/2024 DAWN MC NULTY
Construction near power lines Cleared 5/8/2024 RIDWAN HARDY
Construction within easement Cleared 5/8/2024 RIDWAN HARDY
Miscellaneous Cleared 7/30/2024 YINGSHI HUANG
Low Impact Development (LID) Cleared 9/19/2024 LUIS LUVANO
Miscellaneous Cleared 9/22/2024 DAWN MC NULTY
Roof/Waste drainage to street Cleared 9/23/2024 CARLOS AGUILERA

Contact Information

Architect Holtz,, Donald Lee; Lic. No.: C21677 700 S FLOWER ST #1000      LOS ANGELES, CA 90017
Contractor Luban Z Construction Corp; Lic. No.: 1033129-B       ,
Engineer Hwang,, Junho; Lic. No.: S5592 2450 W MAIN ST      ALHAMBRA, CA 91801
Engineer Smith,, Melvin Bruce; Lic. No.: GE2673 2165 N MARVEL AVE      SIMI VALLEY, CA 93065

Inspector Information

GAREN HAYRAPETYAN, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI
ROBERTO PALACIOS-LOPEZ, (818) 374-1171 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Enclosure/Fence 3/4/2025 Not Ready for Inspection MICHAEL CORTEZ
Excavation/Setback/Form/Re-Bar 3/7/2025 Corrections Issued JOSE AVILA
Excavation/Setback/Form/Re-Bar 4/4/2025 Not Ready for Inspection JOSE AVILA
Footing/Foundation/Slab 4/4/2025 Not Ready for Inspection JOSE AVILA
Masonry Wall/Backfill 4/4/2025 Not Ready for Inspection JOSE AVILA
Sewer 5/15/2025 Not Ready for Inspection JOSE AVILA
Underground Mechanical 6/10/2025 Corrections Issued JOSE AVILA
PLUMBING-Rough 6/11/2025 Corrections Issued JOSE AVILA
Excavation/Setback/Form/Re-Bar 8/7/2025 Corrections Issued JOSE AVILA
Wood Frame 9/5/2025 Corrections Issued ROBERTO PALACIOS-LOPEZ
Footing/Foundation/Slab 9/8/2025 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 9/12/2025 Corrections Issued JOSE AVILA
Wood Frame 10/1/2025 Approved JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 10/7/2025 Corrections Issued JOSE AVILA
Special/Order Compliance 11/19/2025 Partial Inspection JOSE AVILA
Special/Order Compliance 12/11/2025 Partial Inspection JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 1/22/2026 Corrections Issued JOSE AVILA
Special/Order Compliance 1/22/2026 Approved JOSE AVILA
Deputy Wood Construction 2/10/2026 Conditional Approval JOSE AVILA
Floor/Roof Diaphrgm/Shear Wall 2/11/2026 Partial Approval JAVIER RAMOS JR
Interior/Exterior Lathing 3/6/2026 Corrections Issued ROBERTO PALACIOS-LOPEZ
Interior/Exterior Lathing 3/19/2026 Corrections Issued GAREN HAYRAPETYAN
Green Building Rough 7/13/2026 Not Ready for Inspection ROBERTO PALACIOS-LOPEZ
Pre-Inspection 7/13/2026 Partial Inspection ROBERTO PALACIOS-LOPEZ