10523 W ISADORA LANE 90077

Certificate Information: 10523 W ISADORA LANE 90077

Application / Permit
23014-20000-03605
Plan Check / Job No.
B23VN12120
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
10'-11" X 12'-0" ADDITION TO (E) SFD. WORK DONE PER ENGINEERING. **1 - check the required natural light & ventilation into adjacent room(s). 2- check the required slope setback**
Permit Issued
Issued on 9/28/2023
Issuing Office
West Los Angeles
Current Status
CofO Issued on 4/9/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 9/7/2023 APPLICANT
Assigned to Plan Check Engineer 9/7/2023 MIROOSH KHACHATOORIAN
Corrections Issued 9/7/2023 MIROOSH KHACHATOORIAN
Plan Check Approved 9/28/2023 CAROLEAN BASMA
Issued 9/28/2023 APPLICANT
CofO in Progress 4/8/2024 CHRISTOPHER WILSON
Permit Finaled 4/9/2024 DANIEL ORRANTE
CofO Issued 4/9/2024 DANIEL ORRANTE
Permit Finaled 4/9/2024 DANIEL ORRANTE

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 9/12/2023 DARIN LAM
Roof/Waste drainage to street Cleared 9/12/2023 DARIN LAM

Contact Information

Contractor Owner-Builder       ,
Engineer Maalouf,, Sami; Lic. No.: C53210 15445 VENTURA BLVD STE 367      SHERMAN OAKS, CA 91403

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/1/2023 Approved CHRISTOPHER WILSON
Footing/Foundation/Slab 12/5/2023 Corrections Issued CHRISTOPHER WILSON
Deputy Drilled-In Anchors 12/13/2023 Conditional Approval MICHAEL PELHAM
Excavation/Setback/Form/Re-Bar 12/14/2023 Partial Approval CHRISTOPHER WILSON
Footing/Foundation/Slab 12/14/2023 Partial Approval CHRISTOPHER WILSON
BUILDING-Rough-Frame 1/23/2024 Corrections Issued BRENDAN LOONEY
ELECTRICAL-Rough 1/23/2024 Not Ready for Inspection BRENDAN LOONEY
BUILDING-Rough-Frame 2/7/2024 Corrections Issued STEPHANIE SWANSON
ELECTRICAL-Rough 2/7/2024 Approved STEPHANIE SWANSON
BUILDING-Rough-Frame 2/13/2024 Partial Approval CHRISTOPHER WILSON
Deputy Wood Construction 2/13/2024 Conditional Approval CHRISTOPHER WILSON
Floor/Roof Diaphrgm/Shear Wall 2/16/2024 Approved CHRISTOPHER WILSON
Green Building Rough 2/16/2024 Approved CHRISTOPHER WILSON
Insulation 2/16/2024 Approved CHRISTOPHER WILSON
Interior/Exterior Lathing 2/16/2024 Approved CHRISTOPHER WILSON
Drywall Nailing 2/23/2024 Approved CHRISTOPHER WILSON
Final 3/26/2024 Corrections Issued CHRISTOPHER WILSON
Footing/Foundation/Slab 3/26/2024 Approved CHRISTOPHER WILSON
Green Building Final 3/26/2024 Approved CHRISTOPHER WILSON
SGSOV-Seismic Gas S/O Valve 3/26/2024 SGSOV Approved CHRISTOPHER WILSON
Smoke Detectors 3/26/2024 Corrections Issued CHRISTOPHER WILSON
Wood Frame 3/26/2024 Approved CHRISTOPHER WILSON
Final 4/5/2024 OK to Issue CofO CHRISTOPHER WILSON
Smoke Detectors 4/5/2024 Approved CHRISTOPHER WILSON